My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-09-09 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-09-09 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 3:33:55 PM
Creation date
9/5/2019 5:14:26 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/9/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
440
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.C. - Page 23 of 33 <br />3.6.2 Contractor's Schedules. PM shall recommend a process and procedure for <br />documentation and tracking of the Contractor(s)' schedule. PM shall review the <br />Contractor's construction schedules and updates thereof for: <br />(i) verification of conformity to the requirements established in the construction <br />contract for the Project; <br />(ii) verification that all necessary activities to complete construction of the Project <br />in accordance with the design documents and the construction contract for the <br />Project are reflected in the Contractor's schedules; <br />(iv) verification that the duration for construction activities are reasonable; and, <br />(v) if required by the terms of the construction contract for the Project, <br />verification that the Contractor's schedules incorporate requirements for <br />manpower and other resources necessary for the Contractor's construction of <br />the Project. <br />The PM shall establish a baseline and document and track the following for <br />deviations: <br />(i) float; <br />(ii) critical path; and <br />(iii) activity progress including late completion of activities and the resulting <br />impacts; <br />If the PM, upon review of the Contractor's schedules is unable to verify any of the <br />matters set forth above, the PM shall coordinate with the Contractor to obtain this <br />information. Where Contractor does not comply with PM's request, PM shall <br />notify the CITY in writing of such inability, along with recommendations for <br />actions of the Contractor or modifications to the Contractor's schedules so that <br />the PM can verify such matters. The PM shall implement such measures as <br />directed or authorized by the CITY. <br />The PM shall actively monitor Contractor activities for timeliness against the <br />established schedule. <br />Where PM discovers schedule discrepancies that could affect the critical path, <br />PM shall bring it to Contractor(s)' attention such that Contractor(s) may plan <br />actions or activities to remediate the progress (recovery schedule). Where <br />Contractor discovers the schedule discrepancy, PM shall familiarize itself and <br />understand the issue. <br />In all cases, PM shall formally document the cause, effect on schedule, and <br />actions planned and taken. PM shall log schedule discrepancies for review, <br />inspection and/or reproduction by the CITY upon request. <br />3.6.3 Progress Records. PM will produce and maintain records of the monthly progress <br />of construction of Project construction, including written progress reports and <br />photographs reflecting the status of construction, percentage completion of the <br />REV: 08-28-19 PR <br />ATTY/AGR.2019.216/Gilbane (Page 20 of 30) <br />91 <br />