My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt19 Gilbane Building Company
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2019
>
Agmt19 Gilbane Building Company
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2026 11:48:36 AM
Creation date
9/18/2019 12:18:06 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Gilbane Building Company
PROJECT NAME
Project managemente & inspectation services for Vet Memorial/Senior Center project
RMP File Number
304
Date
9/16/2019
MO Ref
19-179,21-170
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4.4 Prosect Reports. The PM shall encourage, monitor, and ensure the filing of <br />reports and other actions required by applicable law, rule or regulation to be <br />undertaken by the Architect and Contractor during construction of the Project and <br />upon completing construction of the Project. <br />If after encouraging the Architect or Contractor and they have not filed reports or <br />taken other actions in the timeframe required, the PM shall make <br />recommendations to the CITY for measures to secure compliance by the <br />Architect or Contractor regarding such requirements. The PM will assist the CITY <br />in completion and submission of reports and other actions required to be <br />undertaken by the CITY during construction of the Project or upon completing <br />construction of the Project pursuant to applicable law, rule or regulation. <br />4.5 Fixtures, Furniture & Equipment (FF&E). PM shall assist CITY in facilitating <br />procurement and coordination of CITY purchased FF&E arrival and installation <br />by CITY contractor(s) and/or vendor(s). <br />4.6 Relocation. The PM shall coordinate scheduling of CITY staff relocations, <br />occupancy, and moving services contractors. PM shall administer CITY contract <br />requirements with these moving and relocation services. <br />4.7 Warranty Walk. Approximately 9 months following Final Completion, the PM shall <br />schedule, coordinate, and lead the Project warranty walk, ensuring the presence <br />of all pertinent parties, including but not limited to, CITY, Architect, Engineer, and <br />Contractor. In coordination with the CITY, the PM shall prepare a list of all the <br />recurring repairs and issues observed at the Project. The PM shall walk through <br />the list at the meeting to discuss outstanding issues covered by product and <br />labor warranties. The PM shall coordinate to ensure that all issues are resolved <br />in a manner satisfactory to the CITY. <br />4.8 Other Closeout. PM shall <br />(i) closeout all punch list items with Contractor; <br />(ii) closeout all commissioning log items; <br />(iii) closeout all CITY direct vendor work; <br />(iv) resolve all change orders and assist in resolution of claims; and, <br />(v) assist with setting up maintenance contracts (if needed). <br />5.0 PERSONNEL <br />5.1 CONSULTANT shall assign the following personnel/staff in the following roles. <br />Removal or reassignment of personnel shall be with prior written consent of the <br />CITY. <br />1. Patrick Downey is assigned as the Project Manager/Owner Representative. This <br />position shall be the City's main point of contact. <br />2. Robin Mathers is assigned as the Superintendent. <br />REV: 08-21-19 PR <br />
The URL can be used to link to this page
Your browser does not support the video tag.