Laserfiche WebLink
6.B. - Page 1 of 16 <br />/<�ik <br />Redwood <br />CitylCallifornia <br />Faunded 1867 <br />A,&/ <br />DATE: September 23, 2019 <br />SUBJECT <br />STAFF REPORT <br />To the Honorable Mayor and City Council <br />From the City Manager <br />Professional services agreement with SCA Environmental, Inc. to provide environmental services for the <br />construction phase of the California Water Tank, Pump Station and Transmission Main Project <br />RECOMMENDATION <br />By motion, authorize the City Manager to execute a professional services agreement with SCA <br />Environmental, Inc. to provide environmental services for the construction phase of the California Water <br />Tank, Pump Station and Transmission Main Project in the amount of $261,760, and authorize the City <br />Manager to amend the agreement for an additional amount of $26,176 in the event additional services <br />are necessary, for a total contract amount of $287,936. <br />STRATEGIC INITIATIVE <br />Public Safety <br />BACKGROUND <br />The California Water Tank, Pump Station and Transmission Main Project (Project) involves the <br />construction of a new 750,000 gallon water tank, including associated pipelines and pump station <br />facilities. The project components are: <br />• Construction of a potable water tank on a City -owned site at 840 California Way, at the <br />intersection with Tum Suden Way; <br />• Construction of a soil nailed retaining wall approximately 160 linear foot long and from 7 to 20 <br />feet high, located on the hillside west side of the tank; <br />• Replacement of existing pipeline to connect the new water tank to the Easter Cross water tank, <br />located up-slope of the project site; <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.ore <br />74 <br />