My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-09-23 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-09-23 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 1:28:42 PM
Creation date
9/19/2019 1:35:36 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/23/2019
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Created:
9/19/2019 1:36 PM
Modified:
9/19/2019 1:36 PM
Text:
http://www.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.B. - Page 1 of 16 <br />/<�ik <br />Redwood <br />CitylCallifornia <br />Faunded 1867 <br />A,&/ <br />DATE: September 23, 2019 <br />SUBJECT <br />STAFF REPORT <br />To the Honorable Mayor and City Council <br />From the City Manager <br />Professional services agreement with SCA Environmental, Inc. to provide environmental services for the <br />construction phase of the California Water Tank, Pump Station and Transmission Main Project <br />RECOMMENDATION <br />By motion, authorize the City Manager to execute a professional services agreement with SCA <br />Environmental, Inc. to provide environmental services for the construction phase of the California Water <br />Tank, Pump Station and Transmission Main Project in the amount of $261,760, and authorize the City <br />Manager to amend the agreement for an additional amount of $26,176 in the event additional services <br />are necessary, for a total contract amount of $287,936. <br />STRATEGIC INITIATIVE <br />Public Safety <br />BACKGROUND <br />The California Water Tank, Pump Station and Transmission Main Project (Project) involves the <br />construction of a new 750,000 gallon water tank, including associated pipelines and pump station <br />facilities. The project components are: <br />• Construction of a potable water tank on a City -owned site at 840 California Way, at the <br />intersection with Tum Suden Way; <br />• Construction of a soil nailed retaining wall approximately 160 linear foot long and from 7 to 20 <br />feet high, located on the hillside west side of the tank; <br />• Replacement of existing pipeline to connect the new water tank to the Easter Cross water tank, <br />located up-slope of the project site; <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.ore <br />74 <br />
The URL can be used to link to this page
Your browser does not support the video tag.