My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt19 SCA Environmental, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2019
>
Agmt19 SCA Environmental, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2021 2:40:48 PM
Creation date
10/3/2019 9:22:44 AM
Metadata
Fields
Template:
Agreement
Contractor Name
SCA Environmental, Inc.
PROJECT NAME
Ca Water tank , pump station and transmission main project air quality monitoring
RMP File Number
304
Date
9/27/2019
MO Ref
19-183, Amend no 120-145
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LEVEL OF EFFORT/TASKS/ALLOCATION OF RESOURCES <br />TASK 2: Technical Consultation Services <br />Technical consultation will include as -needed services as required by City for <br />liaison with BAAQMD. Services will include preparation of a formal request to <br />BAAQMD for a reduction in FAQM, teleconferences and/or meetings with <br />BAAQMD, etc. <br />LEVEL OF EFFORT/TASKS/ALLOCATION OF RESOURCES <br />Task <br />Personnel <br />Estimated <br />Sub -tasks <br />Personnel <br />No. of <br />Technical Consultation Services <br />Senior Consultant <br />Shifts <br />1.1 Standard Shift, Air Quality <br />Daily, All necessary personnel, <br />130 <br />Monitoring <br />see description above <br />1.2 Mobilization/Demobilization <br />As needed, all necessary <br />3 <br />of Equipment <br />personnel, see description above <br />TASK 2: Technical Consultation Services <br />Technical consultation will include as -needed services as required by City for <br />liaison with BAAQMD. Services will include preparation of a formal request to <br />BAAQMD for a reduction in FAQM, teleconferences and/or meetings with <br />BAAQMD, etc. <br />LEVEL OF EFFORT/TASKS/ALLOCATION OF RESOURCES <br />Task <br />Personnel <br />Estimated <br />No. of Hours <br />Technical Consultation Services <br />Senior Consultant <br />8 <br />TASK 3: Review of the Soil Management Plan (SMP) Prepared by the <br />Project Contractor. <br />The work under this task will include two reviews of the SMP prepared by <br />the Project Contractor. The Consultant will provide comments on the SMP to <br />the City. <br />LEVEL OF EFFORT/TASKS/ALLOCATION OF RESOURCES <br />Task <br />Personnel <br />Estimated <br />No. of Hours <br />SMP Review <br />Senior Consultant <br />12 <br />SCHEDULE <br />The Schedule for this agreement is subject to the duration of the construction <br />phase of the California Water Tank, Pump Station, and Transmission Main Project. <br />The time allowed for the completion of the Project is 940 working days in addition <br />to any additional time for excusable and non -excusable extension of contract time. <br />The Consultant shall perform the above mentioned services on a continuous, <br />intermittent, full-time or part-time schedule as described above, subject to the <br />construction schedule of the Project Tasks; and until the Project is completed. <br />REV: 09-12-19 PR <br />ATrY/AGR.2019.244/SCA Environmental, Inc. (Page 10 of 12) <br />
The URL can be used to link to this page
Your browser does not support the video tag.