My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt19 SCA Environmental, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2019
>
Agmt19 SCA Environmental, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2021 2:40:48 PM
Creation date
10/3/2019 9:22:44 AM
Metadata
Fields
Template:
Agreement
Contractor Name
SCA Environmental, Inc.
PROJECT NAME
Ca Water tank , pump station and transmission main project air quality monitoring
RMP File Number
304
Date
9/27/2019
MO Ref
19-183, Amend no 120-145
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT "A" <br />SCOPE OF SERVICES <br />SCOPE OF WORK <br />Consultant will provide services for the construction phase of the California <br />Water Tank, Pump Station and Transmission Main Project ("Project') as set <br />forth herein. Consultant will provide both full-time and part-time inspection as <br />needed for the three tasks: Fenceline Air Quality Monitoring (FAQM), Technical <br />Consultation Services, and Soil Management Plan Review. <br />TASK 1: Fenceline Air Quality Monitoring (FAQM) — For Asbestos <br />Sub -task 1.1 Fenceline Air Quality Monitoring will include observation and <br />testing as necessary for the Asbestos Dust Mitigation Plan (ADMP) outlined <br />below related to the proposed earthwork for the Project. <br />1. Consultant will be responsible for the oversight and monitoring to ensure <br />compliance with the ADMP including: <br />a. Conducting daily inspections, <br />b. Conducting air monitoring, <br />c. Notifying the Project Manager and proper response agency in the <br />event of an emergency, and <br />d. Completing the necessary record keeping. <br />Services will include observation, laboratory testing as necessary to document <br />specification compliance, and to confirm field observations. Daily inspections <br />shall include eight hours of an Environmental Specialist field sampling and <br />inspecting earthwork, two hours of an environmentalist overtime preparing a <br />daily inspection report and transporting samples to a laboratory for testing, half <br />an hour of project administration and QA/QC, CARB TEM analysis lab test, <br />batteries, pumps, and filters. <br />Sub -task 1.2 Lapses in daily shifts exceeding three succeeding shifts will <br />require the monitoring equipment to be removed from the site (demobilized) <br />and re -mobilized to resume monitoring, when additional monitoring is required. <br />The work task for Mobilization/Demobilization of Equipment will include one <br />hour of administration and scheduling, eight hours of an environmental <br />specialist, and one hour of a field vehicle. <br />REV: 09-12-19 PR <br />ATTY/AGR.2019.244/SCA Environmental, Inc. (Page 9 of 12) <br />
The URL can be used to link to this page
Your browser does not support the video tag.