Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY MAKING FINDINGS AS A RESPONSIBLE AGENCY PURSUANT TO THE CALIFORNIA ENVIRONMENTAL QUALITY ACT IN CONNECTION WITH APPROVAL OF A MEMORANDUM OF AGREEMENT WITH THE CITY AND COUNTY OF SAN FRANCISCO FOR THE BAY DIVISION PIPELINE NO.5 PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT B <br />I. MOA WORK AS PROVIDED IN THE PROJECT DRAWINGS AS DETAILED BELOW <br />General Requirements and <br />Trench Details for City of PO -1 <br />Redwood City <br />E1 Camino Real <br />PI -54 <br />SFPUC Engineering <br />Management Bureau <br />SFPUC Engineering <br />Management Bureau <br />July, 2009 <br />July, 2009 <br />Streets within <br />268+70 to <br />364+30, <br />STA 389+00 <br />393+40 <br />STA 265+00 <br />STA <br />STA <br />to <br />1. Except for work at the El Camino Real and Cordilleras Rd <br />crossings or as otherwise agreed to by City and CCSF, <br />CCSF's Contractor will perform Project construction work <br />within Redwood City's boundaries only from Mondays <br />through Fridays between the hours of 7:30 am to 4:30 pm, <br />with no such work on weekends and holidays. <br />2. Hot -mix asphalt will be used for temporary trench paving. <br />Each area of City's paving or sidewalk affected by Project <br />construction work, including traffic loops, shall be finally <br />restored per Redwood City standards within 21 calendar <br />days after the final trench backfill at or adjacent to such <br />area. <br />3. Restoration of finished surfaces (dirt and/or asphalt) will <br />match existing ground level and storm water flow patterns. <br />4. Street trench paving will be restored with 4 -inch minimum <br />asphalt concrete or to match pre-existing thickness per City <br />Standards. <br />5. No sand shall be used to backfill pipe trenches within City's <br />public streets and City -owned parcels in the City. Warning <br />and ID tapes shall be used on City's pipe trenches. <br />Controlled Density Fill (CDF) or soil cement with equivalent <br />properties as CDF shall be acceptable trench backfill <br />materials for these locations. If CDF or soil cement are not <br />used, trench backfill within City's public streets and City - <br />owned parcels shall be modified Class 1 Type A backfill <br />compacted to 95% compaction in accordance with RWC <br />standard details UT -1 or UT -2. <br />6. Traffic control plans shall be prepared in strict accordance <br />with spec 01570 of WD -2542. <br />7. Except as allowed below, pipe installation work shall not <br />occur at two adjacent intersections at the same time. <br />8. CCSF shall perform required sanitary sewer CCTV <br />inspections both before and after the completion of Project <br />work within City's boundaries. <br />9. Pipeline headings shall be allowed at two separate locations <br />concurrently within RWC. Minimum separation between <br />pipeline headings shall be 2500 ft to limit the cumulative <br />traffic impacts to the surrounding neighborhoods. Other <br />work with less impact, such as trenchless crossings, <br />restoration, or preparatory work, shall not be constrained <br />by this requirement. <br />CCSF's Contractor shall conduct closed circuit television (CCTV) <br />inspection of two 8 -inch existing sewer pipes which cross the new <br />proposed pipeline within E1 Camino Real. <br />B-1 Redwood Cid MOA 100318 PD 7LO RH FINAL DOC <br />WD -2542 <br />Approximate <br />Feature <br />Drawing Number <br />Prepared by <br />Date <br />Stationing <br />MOA Work and Agreements with Redwood Ci RWC <br />General Requirements and <br />Trench Details for City of PO -1 <br />Redwood City <br />E1 Camino Real <br />PI -54 <br />SFPUC Engineering <br />Management Bureau <br />SFPUC Engineering <br />Management Bureau <br />July, 2009 <br />July, 2009 <br />Streets within <br />268+70 to <br />364+30, <br />STA 389+00 <br />393+40 <br />STA 265+00 <br />STA <br />STA <br />to <br />1. Except for work at the El Camino Real and Cordilleras Rd <br />crossings or as otherwise agreed to by City and CCSF, <br />CCSF's Contractor will perform Project construction work <br />within Redwood City's boundaries only from Mondays <br />through Fridays between the hours of 7:30 am to 4:30 pm, <br />with no such work on weekends and holidays. <br />2. Hot -mix asphalt will be used for temporary trench paving. <br />Each area of City's paving or sidewalk affected by Project <br />construction work, including traffic loops, shall be finally <br />restored per Redwood City standards within 21 calendar <br />days after the final trench backfill at or adjacent to such <br />area. <br />3. Restoration of finished surfaces (dirt and/or asphalt) will <br />match existing ground level and storm water flow patterns. <br />4. Street trench paving will be restored with 4 -inch minimum <br />asphalt concrete or to match pre-existing thickness per City <br />Standards. <br />5. No sand shall be used to backfill pipe trenches within City's <br />public streets and City -owned parcels in the City. Warning <br />and ID tapes shall be used on City's pipe trenches. <br />Controlled Density Fill (CDF) or soil cement with equivalent <br />properties as CDF shall be acceptable trench backfill <br />materials for these locations. If CDF or soil cement are not <br />used, trench backfill within City's public streets and City - <br />owned parcels shall be modified Class 1 Type A backfill <br />compacted to 95% compaction in accordance with RWC <br />standard details UT -1 or UT -2. <br />6. Traffic control plans shall be prepared in strict accordance <br />with spec 01570 of WD -2542. <br />7. Except as allowed below, pipe installation work shall not <br />occur at two adjacent intersections at the same time. <br />8. CCSF shall perform required sanitary sewer CCTV <br />inspections both before and after the completion of Project <br />work within City's boundaries. <br />9. Pipeline headings shall be allowed at two separate locations <br />concurrently within RWC. Minimum separation between <br />pipeline headings shall be 2500 ft to limit the cumulative <br />traffic impacts to the surrounding neighborhoods. Other <br />work with less impact, such as trenchless crossings, <br />restoration, or preparatory work, shall not be constrained <br />by this requirement. <br />CCSF's Contractor shall conduct closed circuit television (CCTV) <br />inspection of two 8 -inch existing sewer pipes which cross the new <br />proposed pipeline within E1 Camino Real. <br />B-1 Redwood Cid MOA 100318 PD 7LO RH FINAL DOC <br />