My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res10 14996
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res10 14996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2019 12:25:00 PM
Creation date
10/11/2019 7:42:39 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
1/25/2010
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY MAKING FINDINGS AS A RESPONSIBLE AGENCY PURSUANT TO THE CALIFORNIA ENVIRONMENTAL QUALITY ACT IN CONNECTION WITH APPROVAL OF A MEMORANDUM OF AGREEMENT WITH THE CITY AND COUNTY OF SAN FRANCISCO FOR THE BAY DIVISION PIPELINE NO.5 PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Redwood Citv MOA 100318 PD JLO RH FINAL DOCp ed eed City NIOA 100309 PD PLO R14 DOC <br />Contractor shall maintain emergency access and place Road Closed <br />SFPUC Engineering <br />Ahead signs at each end of the block during work hours. Pipeline <br />Park St/Linden Street <br />P1-55 <br />Management Bureau <br />July, 2009 <br />STA 268+70 <br />installation shall occur between 7:30AM to 4:30PM, M -F, when the <br />road may be closed. Any affected areas of paving and sidewalks <br />shall be restored per Redwood City standards. <br />Contractor shall not be required to rebuild this park after <br />Linden Park <br />P1-55 <br />SFPUC Engineering <br />July, 2009 <br />STA 269+00 to <br />completion of pipeline installation. Disturbed area shall be <br />Management Bureau <br />STA 270+90 <br />restored to be leveled, clean and clear of all debris and loose soil. <br />Site shall be rough graded to match existing condition or better. <br />Only one of these two streets may be closed at any given time, <br />provided the other street is maintained with at least one reversible <br />open lane at all times during such closure. Madrone may be fully <br />closed only between 7:30AM to 4:30PM, M -F. Center St. may be <br />Center StlMadrone Street <br />P1-56 <br />SFPUC Engineering <br />July, 2009 <br />STA 272+75 <br />fully closed only between 9:OOAM to 4:OOPM, M -F. Two lanes on <br />Management Bureau <br />both streets shall remain open during non -work hours. Affected <br />areas of paving and sidewalks shall be restored per Redwood City <br />standards. CCSF's Contractor shall conduct closed circuit <br />television (CCTV) inspection of a 6 -inch existing sewer pipe which <br />crosses the new proposed pipeline in Center Street. <br />Pipeline installation shall occur between 7:30AM to 4:30PM, M -F, <br />when the road may be closed. Any affected areas of paving and <br />McEvoy Street <br />P1-56 <br />SFPUC Engineering <br />July, 2009 <br />STA 276+00 <br />sidewalks shall be restored per Redwood City standards. <br />Management Bureau <br />CCSF's Contractor shall conduct closed circuit television (CCTV) <br />inspection of a 6 -inch existing sewer pipe which crosses the new <br />proposed pipeline in McEvoy Street. <br />CCSF's Contractor shall restore any affected areas of Fleishman <br />SFPUC Engineering <br />STA 276+30 to <br />Park, including new Water Feature, paving, irrigation and <br />Fleishman Park <br />P1-569 P1-57 <br />Management Bureau <br />July, 2009 <br />STA 277+75 <br />landscaping per the existing Fleishman Park drawings attached to <br />Project drawings. <br />CCSF's Contractor shall allow access to residence at 150 Locust <br />Street and 127 Locust Street during non -work hours, and <br />SFPUC Engineering <br />emergency access during work hours. Any affected areas of paving <br />Locust Street <br />P1-57 <br />Management Bureau <br />July, 2009 <br />STA 278+40 <br />and sidewalks shall be restored per Redwood City standards. <br />CCSF's Contractor shall conduct closed circuit television (CCTV) <br />inspection of a 6 -inch existing sewer pipe which crosses the new <br />proposed pipeline in Locust. <br />Pipeline installation shall occur between 7:30AM to 4:30PM, M -F, <br />when the road may be closed. Any affected areas of paving and <br />Hemlock Avenue <br />P1-57 <br />SFPUC Engineering <br />July, 2009 <br />STA 280+65 <br />sidewalks shall be restored per Redwood City standards. <br />Management Bureau <br />CCSF's Contractor shall conduct closed circuit television (CCTV) <br />inspection of a 6 -inch existing sewer pipes which crosses the new <br />proposed pipeline in Hemlock Avenue. <br />Woodside Road <br />PI -58 <br />SFPUC Engineering <br />Management Bureau <br />July, 2009 <br />STA 283+00 <br />Trenchless crossing. <br />CCSF's Contractor shall allow access to 1491 Hess Rd during non - <br />1491 Hess Road <br />P1-60 <br />SFPUC Engineering <br />July, 2009 <br />STA 292+80 <br />work hours, and emergency access during work hours. <br />Management Bureau <br />Redwood Citv MOA 100318 PD JLO RH FINAL DOCp ed eed City NIOA 100309 PD PLO R14 DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.