Laserfiche WebLink
B-3 Redwood City MOA 100318 PD JLO RH FINAL DOC <br />Pipeline installation shall occur between 9:OOAM to 4:OOPM, M -F, <br />when the road may be closed. Any affected areas of paving and <br />Poplar Avenue <br />P1-60 <br />SFPUC Engineering <br />July, 2009 <br />STA 292+80 <br />sidewalks shall be restored per Redwood City standards. <br />Management Bureau <br />CCSF's Contractor shall conduct closed circuit television (CCTV) <br />inspection of the 6 -inch and 18 -inch existing sewer pipes which <br />cross the new proposed pipeline in Poplar Avenue. <br />i <br />Trenchless crossing. CCSF shall submit 2 settlement monitoring <br />reports. The first report shall be submitted at the end of the first <br />Redwood Ave/Ebener <br />SFPUC Engineering <br />month after the completion of the trenchless work. The second <br />Street <br />P1-61 <br />Management Bureau <br />July, 2009 <br />STA 297+20 <br />report shall be submitted at the 11th month after the completion of <br />the trenchless work and prior to the expiration of the 12 -month <br />warranty period. Temporary survey benchmarks shall be <br />established for the monitoring to assure no settlement has <br />occurred. <br />Pipeline installation shall occur between 9:OOAM to 3:OOPM, M -F, <br />SFPUC Engineering <br />when the road may be closed. Any affected areas of paving and <br />Oak Avenue <br />P1-62 <br />Management Bureau <br />July, 2009 <br />STA 302+60 <br />sidewalks shall be restored per Redwood City standards. <br />All construction, including restoration, shall occur during a single <br />season, between June 15 and August 15 only. Pipeline installation <br />shall occur between 9:OOAM to 3:OOPM, M -F, when the road may <br />be closed. Contractor shall place changeable message signs in both <br />SFPUC Engineering <br />traffic directions advising drivers of lane closure schedule for at <br />Hudson Street <br />P1-639 P1-62 <br />Management Bureau <br />July, 2009 <br />STA 306+00 <br />least one week in advance of and continuing during work. Any <br />affected areas of paving and sidewalks shall be restored per <br />Redwood City standards. <br />CCSF's Contractor shall conduct closed circuit television (CCTV) <br />inspection of the 6 -inch and 12 -inch existing sewer pipes which <br />cross the new proposed pipeline in Hudson Street. <br />Hawes Elementary School, <br />P1-63, P1-64 <br />SFPUC Engineering <br />STA 306+50 to <br />School grounds shall be restored as stated in the Memorandum of <br />Hawes Park <br />C33-1 <br />Management Bureau <br />July, 2009 <br />STA 312+75 <br />Agreement between CCSF and the Redwood City School District. <br />All construction, including restoration, shall occur during a single <br />season, between June 15 and August 15 only. CCSF's Contractor <br />shall maintain one 11 ft reversible lane open during work hours <br />(9AM to 2PM2), and two lanes open at all other times. Contractor <br />shall place changeable message signs in both traffic directions <br />Roosevelt Avenue <br />P1-64 <br />SFPUC Engineering <br />Jul2009 <br />y, <br />STA 313+10 <br />advising drivers of lane closure schedule for at least one week in <br />Management Bureau <br />advance of and continuing during work. Any affected areas of <br />paving and sidewalks shall be restored per Redwood City <br />standards. <br />CCSF's Contractor shall conduct closed circuit television (CCTV) <br />inspection of the 8 -inch and 21 -inch existing sewer pipes which <br />cross the new proposed pipeline in Roosevelt Avenue. <br />Pipeline installation shall occur between 7:30AM to 4:30PM, M -F, <br />SFPUC Engineering <br />when the road may be closed. Any affected areas of paving and <br />Johnson Street <br />P1-64 <br />Management Bureau <br />July, 2009 <br />STA 314+80 <br />sidewalks shall be restored per Redwood City standards. <br />B-3 Redwood City MOA 100318 PD JLO RH FINAL DOC <br />