My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res10 14996
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res10 14996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2019 12:25:00 PM
Creation date
10/11/2019 7:42:39 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
1/25/2010
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY MAKING FINDINGS AS A RESPONSIBLE AGENCY PURSUANT TO THE CALIFORNIA ENVIRONMENTAL QUALITY ACT IN CONNECTION WITH APPROVAL OF A MEMORANDUM OF AGREEMENT WITH THE CITY AND COUNTY OF SAN FRANCISCO FOR THE BAY DIVISION PIPELINE NO.5 PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B-3 Redwood City MOA 100318 PD JLO RH FINAL DOC <br />Pipeline installation shall occur between 9:OOAM to 4:OOPM, M -F, <br />when the road may be closed. Any affected areas of paving and <br />Poplar Avenue <br />P1-60 <br />SFPUC Engineering <br />July, 2009 <br />STA 292+80 <br />sidewalks shall be restored per Redwood City standards. <br />Management Bureau <br />CCSF's Contractor shall conduct closed circuit television (CCTV) <br />inspection of the 6 -inch and 18 -inch existing sewer pipes which <br />cross the new proposed pipeline in Poplar Avenue. <br />i <br />Trenchless crossing. CCSF shall submit 2 settlement monitoring <br />reports. The first report shall be submitted at the end of the first <br />Redwood Ave/Ebener <br />SFPUC Engineering <br />month after the completion of the trenchless work. The second <br />Street <br />P1-61 <br />Management Bureau <br />July, 2009 <br />STA 297+20 <br />report shall be submitted at the 11th month after the completion of <br />the trenchless work and prior to the expiration of the 12 -month <br />warranty period. Temporary survey benchmarks shall be <br />established for the monitoring to assure no settlement has <br />occurred. <br />Pipeline installation shall occur between 9:OOAM to 3:OOPM, M -F, <br />SFPUC Engineering <br />when the road may be closed. Any affected areas of paving and <br />Oak Avenue <br />P1-62 <br />Management Bureau <br />July, 2009 <br />STA 302+60 <br />sidewalks shall be restored per Redwood City standards. <br />All construction, including restoration, shall occur during a single <br />season, between June 15 and August 15 only. Pipeline installation <br />shall occur between 9:OOAM to 3:OOPM, M -F, when the road may <br />be closed. Contractor shall place changeable message signs in both <br />SFPUC Engineering <br />traffic directions advising drivers of lane closure schedule for at <br />Hudson Street <br />P1-639 P1-62 <br />Management Bureau <br />July, 2009 <br />STA 306+00 <br />least one week in advance of and continuing during work. Any <br />affected areas of paving and sidewalks shall be restored per <br />Redwood City standards. <br />CCSF's Contractor shall conduct closed circuit television (CCTV) <br />inspection of the 6 -inch and 12 -inch existing sewer pipes which <br />cross the new proposed pipeline in Hudson Street. <br />Hawes Elementary School, <br />P1-63, P1-64 <br />SFPUC Engineering <br />STA 306+50 to <br />School grounds shall be restored as stated in the Memorandum of <br />Hawes Park <br />C33-1 <br />Management Bureau <br />July, 2009 <br />STA 312+75 <br />Agreement between CCSF and the Redwood City School District. <br />All construction, including restoration, shall occur during a single <br />season, between June 15 and August 15 only. CCSF's Contractor <br />shall maintain one 11 ft reversible lane open during work hours <br />(9AM to 2PM2), and two lanes open at all other times. Contractor <br />shall place changeable message signs in both traffic directions <br />Roosevelt Avenue <br />P1-64 <br />SFPUC Engineering <br />Jul2009 <br />y, <br />STA 313+10 <br />advising drivers of lane closure schedule for at least one week in <br />Management Bureau <br />advance of and continuing during work. Any affected areas of <br />paving and sidewalks shall be restored per Redwood City <br />standards. <br />CCSF's Contractor shall conduct closed circuit television (CCTV) <br />inspection of the 8 -inch and 21 -inch existing sewer pipes which <br />cross the new proposed pipeline in Roosevelt Avenue. <br />Pipeline installation shall occur between 7:30AM to 4:30PM, M -F, <br />SFPUC Engineering <br />when the road may be closed. Any affected areas of paving and <br />Johnson Street <br />P1-64 <br />Management Bureau <br />July, 2009 <br />STA 314+80 <br />sidewalks shall be restored per Redwood City standards. <br />B-3 Redwood City MOA 100318 PD JLO RH FINAL DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.