Laserfiche WebLink
B-6 Redwood Citv MOA 100318 PD 7L0 RH FINAL DOC . <br />2. During normal weekdays (M -F), using trenchless methods, <br />in which case construction hours shall be 7:30AM to <br />4:30PM and no lane closures shall be allowed at any time <br />3. During a Saturday and Sunday, in which case construction <br />hours shall be 7:OOAM to 9:OOPM, during which times the <br />road may be closed <br />If method 1 or 3, Contractor shall place changeable message signs <br />in both traffic directions advising drivers of lane closure schedule <br />for at least one week in advance of and continuing during work. In <br />all cases, construction shall occur between June 1 to August 30th, <br />and CCSF shall schedule future coordination meetings with RWC <br />prior to commencement of work. Any affected areas of paving and <br />sidewalks shall be restored per Redwood City standards. <br />CCSF's Contractor shall conduct closed circuit television (CCTV) <br />inspection of 6 -inch existing sewer pipe which crosses the new <br />proposed pipeline in Alameda De Las Pul as. <br />The Eastbound lane shall be closed and the Westbound lane shall <br />have 2 lanes open at all times. The median shall be modified to <br />provide adequate width for 2 lanes on the Westbound side. CCSF's <br />Contractor shall allow access during non -work hours, and <br />SFPUC Engineering <br />STA 389+00 to <br />emergency access during work hours, to residences at 2, 4, 6, 8, 10 <br />Bennett Road <br />P1-79 <br />Management Bureau <br />July, 2009 <br />STA 393+10 <br />and 12 Bennett Road and emergency access at all times. <br />Construction or emergency access shall be provided within 15 <br />minutes of request by Redwood City or its police, fire, or other <br />emergency responder personnel, to CCSF's representative on site. <br />Any affected areas of paving, sidewalks, and median landscaping <br />shall be restored per Redwood City standards. <br />Pipeline installation shall occur between 9:OOAM to 4:OOPM, M -F. <br />CCSF's Contractor shall maintain one reversible lane open during <br />SFPUC Engineering <br />work hours, and two lanes open at all other times. Contractor shall <br />Cordilleras Road <br />P1-80 <br />Management Bureau <br />July, 2009 <br />STA 393+20 <br />place changeable message signs in both traffic directions advising <br />drivers of lane closure schedule for at least one week in advance of <br />and continuing during work. Any affected areas of paving and <br />sidewalks shall be restored per Redwood City standards. <br />City of Redwood City <br />City of Redwood City standard details: A-3-1, A-3-3, A-4-1, A-4-2, <br />Redwood City Standard <br />R-1 <br />Engineering and <br />July, 2009 <br />Various <br />A-7 <br />Plans - Sheet 1 <br />Construction <br />City of Redwood City <br />City of Redwood City standard details: C-1-1, C-1-2, C-2, C-3, C-4, <br />Redwood City Standard <br />R-2 <br />Engineering and <br />July, 2009 <br />Various <br />and other applicable ones. <br />Plans - Sheet 2 <br />Construction <br />City of Redwood City <br />City of Redwood City standard details: C-5, C-6, C-9, C-11 <br />Redwood City Standard <br />R-3 <br />Engineering and <br />July, 2009 <br />Various <br />Plans -Sheet 3 <br />Construction <br />City of Redwood City <br />City of Redwood City standard details: T-1-1, T-1-2, T-1-39 T-79 T - <br />Redwood City Standard <br />R-4 <br />Engineering and <br />July, 2009 <br />Various <br />89 T-12 <br />Plans - Sheet 4 <br />Construction <br />City of Redwood City <br />City of Redwood City standard details: Z-11, Z-14 <br />Redwood City Standard <br />R-5 <br />Engineering and <br />July, 2009 <br />Various <br />Plans -Sheet 5 <br />Construction <br />B-6 Redwood Citv MOA 100318 PD 7L0 RH FINAL DOC . <br />