My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res10 14996
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res10 14996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2019 12:25:00 PM
Creation date
10/11/2019 7:42:39 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
1/25/2010
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY MAKING FINDINGS AS A RESPONSIBLE AGENCY PURSUANT TO THE CALIFORNIA ENVIRONMENTAL QUALITY ACT IN CONNECTION WITH APPROVAL OF A MEMORANDUM OF AGREEMENT WITH THE CITY AND COUNTY OF SAN FRANCISCO FOR THE BAY DIVISION PIPELINE NO.5 PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B-6 Redwood Citv MOA 100318 PD 7L0 RH FINAL DOC . <br />2. During normal weekdays (M -F), using trenchless methods, <br />in which case construction hours shall be 7:30AM to <br />4:30PM and no lane closures shall be allowed at any time <br />3. During a Saturday and Sunday, in which case construction <br />hours shall be 7:OOAM to 9:OOPM, during which times the <br />road may be closed <br />If method 1 or 3, Contractor shall place changeable message signs <br />in both traffic directions advising drivers of lane closure schedule <br />for at least one week in advance of and continuing during work. In <br />all cases, construction shall occur between June 1 to August 30th, <br />and CCSF shall schedule future coordination meetings with RWC <br />prior to commencement of work. Any affected areas of paving and <br />sidewalks shall be restored per Redwood City standards. <br />CCSF's Contractor shall conduct closed circuit television (CCTV) <br />inspection of 6 -inch existing sewer pipe which crosses the new <br />proposed pipeline in Alameda De Las Pul as. <br />The Eastbound lane shall be closed and the Westbound lane shall <br />have 2 lanes open at all times. The median shall be modified to <br />provide adequate width for 2 lanes on the Westbound side. CCSF's <br />Contractor shall allow access during non -work hours, and <br />SFPUC Engineering <br />STA 389+00 to <br />emergency access during work hours, to residences at 2, 4, 6, 8, 10 <br />Bennett Road <br />P1-79 <br />Management Bureau <br />July, 2009 <br />STA 393+10 <br />and 12 Bennett Road and emergency access at all times. <br />Construction or emergency access shall be provided within 15 <br />minutes of request by Redwood City or its police, fire, or other <br />emergency responder personnel, to CCSF's representative on site. <br />Any affected areas of paving, sidewalks, and median landscaping <br />shall be restored per Redwood City standards. <br />Pipeline installation shall occur between 9:OOAM to 4:OOPM, M -F. <br />CCSF's Contractor shall maintain one reversible lane open during <br />SFPUC Engineering <br />work hours, and two lanes open at all other times. Contractor shall <br />Cordilleras Road <br />P1-80 <br />Management Bureau <br />July, 2009 <br />STA 393+20 <br />place changeable message signs in both traffic directions advising <br />drivers of lane closure schedule for at least one week in advance of <br />and continuing during work. Any affected areas of paving and <br />sidewalks shall be restored per Redwood City standards. <br />City of Redwood City <br />City of Redwood City standard details: A-3-1, A-3-3, A-4-1, A-4-2, <br />Redwood City Standard <br />R-1 <br />Engineering and <br />July, 2009 <br />Various <br />A-7 <br />Plans - Sheet 1 <br />Construction <br />City of Redwood City <br />City of Redwood City standard details: C-1-1, C-1-2, C-2, C-3, C-4, <br />Redwood City Standard <br />R-2 <br />Engineering and <br />July, 2009 <br />Various <br />and other applicable ones. <br />Plans - Sheet 2 <br />Construction <br />City of Redwood City <br />City of Redwood City standard details: C-5, C-6, C-9, C-11 <br />Redwood City Standard <br />R-3 <br />Engineering and <br />July, 2009 <br />Various <br />Plans -Sheet 3 <br />Construction <br />City of Redwood City <br />City of Redwood City standard details: T-1-1, T-1-2, T-1-39 T-79 T - <br />Redwood City Standard <br />R-4 <br />Engineering and <br />July, 2009 <br />Various <br />89 T-12 <br />Plans - Sheet 4 <br />Construction <br />City of Redwood City <br />City of Redwood City standard details: Z-11, Z-14 <br />Redwood City Standard <br />R-5 <br />Engineering and <br />July, 2009 <br />Various <br />Plans -Sheet 5 <br />Construction <br />B-6 Redwood Citv MOA 100318 PD 7L0 RH FINAL DOC . <br />
The URL can be used to link to this page
Your browser does not support the video tag.