My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res10 14996
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res10 14996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2019 12:25:00 PM
Creation date
10/11/2019 7:42:39 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
1/25/2010
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY MAKING FINDINGS AS A RESPONSIBLE AGENCY PURSUANT TO THE CALIFORNIA ENVIRONMENTAL QUALITY ACT IN CONNECTION WITH APPROVAL OF A MEMORANDUM OF AGREEMENT WITH THE CITY AND COUNTY OF SAN FRANCISCO FOR THE BAY DIVISION PIPELINE NO.5 PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Redwood City MOA 100318 PD JLO RH FINAL DOCn„a.. eed City N IO e 100309 nn J O R14.DOC- <br />All construction, including restoration, shall occur during a single <br />season, between June 15 and August 15 only. CCSF's Contractor <br />shall allow access to residences along Avenida Del Ora during non - <br />work hours, and emergency access during work hours, and place <br />SFPUC Engineering <br />STA 333+50 to <br />Road Closed Ahead signs at each end of the block. Pipeline <br />Avenida Del Ora <br />P1-689 P1-69 <br />Management Bureau <br />July, 2009 <br />STA 338+25 <br />installation shall occur between 7:30AM to 4:30PM, M -F, when the <br />road may be closed. Any affected areas of paving and sidewalks <br />shall be restored per Redwood City standards. <br />CCSF's Contractor shall conduct closed circuit television (CCTV) <br />inspection of 6 -inch existing sewer pipe which crosses the new <br />ro osed pipeline in Avenue Del Ora. <br />Construction work in front of John Gill Elementary shall occur <br />John Gill Elementary <br />P1-68 P1-69 <br />SFPUC Engineering <br />July, 2009 <br />STA 333+50 to <br />between June 15 and August 15. Any affected areas of paving and <br />School <br />Management Bureau <br />STA 338+25 <br />sidewalks shall be restored per Redwood City standards. <br />Pipeline installation shall occur between 7:30AM to 4:30PM, M -F, <br />SFPUC Engineering <br />when the road may be closed. Any affected areas of paving and <br />South Place <br />P1-69 <br />Management Bureau <br />July, 2009 <br />STA 339+40 <br />sidewalks shall be restored per Redwood City standards. <br />Pipeline installation shall occur between 7:30AM to 4:30PM, M -F, <br />when the road may be closed. Any affected areas of paving and <br />Quartz Street <br />P1-70 <br />SFPUC Engineering <br />July, 2009 <br />STA 345+90 <br />sidewalks shall be restored per Redwood City standards. <br />Management Bureau <br />CCSF's Contractor shall conduct closed circuit television (CCTV) <br />inspection of 6 -inch existing sewer pipe which crosses the new <br />proposed pipeline in Quartz Street. <br />Pipeline installation shall occur between 7:30AM to 4:30PM, M -F, <br />when the road may be closed. Any affected areas of paving and <br />James Avenue <br />P1-71 <br />SFPUC Engineering <br />July, 2009 <br />STA 350+50 <br />sidewalks shall be restored per Redwood City standards. <br />Management Bureau <br />CCSF's Contractor shall conduct closed circuit television (CCTV) <br />inspection of 6 -inch existing sewer pipe which crosses the new <br />proposed pipeline in James Avenue. <br />Pipeline installation shall occur between 7:30AM to 4:30PM, M -F, <br />SFPUC Engineering <br />when the road may be closed. Any affected areas of paving and <br />Harding <br />P1-72 <br />Management Bureau <br />July, 2009 <br />STA 356+10 <br />sidewalks shall be restored per Redwood City standards. <br />Pipeline installation shall occur between 9:OOAM to 4:OOPM, M -F, <br />when the road may be closed. Any affected areas of paving and <br />Topaz <br />P1-73 <br />SFPUC Engineering <br />July, 2009 <br />STA 361+10 <br />sidewalks shall be restored per Redwood City standards. <br />Management Bureau <br />CCSF's Contractor shall conduct closed circuit television (CCTV) <br />inspection of 6 -inch existing sewer pipe which crosses the new <br />ro osed pipeline in Topaz Street. <br />Construction shall occur in one of three ways, mutually exclusive: <br />Alameda De Las Pulgas <br />P1-74 <br />SFPUC Engineering <br />Management Bureau <br />July, 2009 <br />STA 364+30 <br />1. During normal weekdays (M -F), between9:00AM to 4:OOPM <br />M -F, with on lane open during this period, and two lanes <br />o en at all other times. <br />Redwood City MOA 100318 PD JLO RH FINAL DOCn„a.. eed City N IO e 100309 nn J O R14.DOC- <br />
The URL can be used to link to this page
Your browser does not support the video tag.