Laserfiche WebLink
Redwood City MOA 100318 PD JLO RH FINAL DOCn„a.. eed City N IO e 100309 nn J O R14.DOC- <br />All construction, including restoration, shall occur during a single <br />season, between June 15 and August 15 only. CCSF's Contractor <br />shall allow access to residences along Avenida Del Ora during non - <br />work hours, and emergency access during work hours, and place <br />SFPUC Engineering <br />STA 333+50 to <br />Road Closed Ahead signs at each end of the block. Pipeline <br />Avenida Del Ora <br />P1-689 P1-69 <br />Management Bureau <br />July, 2009 <br />STA 338+25 <br />installation shall occur between 7:30AM to 4:30PM, M -F, when the <br />road may be closed. Any affected areas of paving and sidewalks <br />shall be restored per Redwood City standards. <br />CCSF's Contractor shall conduct closed circuit television (CCTV) <br />inspection of 6 -inch existing sewer pipe which crosses the new <br />ro osed pipeline in Avenue Del Ora. <br />Construction work in front of John Gill Elementary shall occur <br />John Gill Elementary <br />P1-68 P1-69 <br />SFPUC Engineering <br />July, 2009 <br />STA 333+50 to <br />between June 15 and August 15. Any affected areas of paving and <br />School <br />Management Bureau <br />STA 338+25 <br />sidewalks shall be restored per Redwood City standards. <br />Pipeline installation shall occur between 7:30AM to 4:30PM, M -F, <br />SFPUC Engineering <br />when the road may be closed. Any affected areas of paving and <br />South Place <br />P1-69 <br />Management Bureau <br />July, 2009 <br />STA 339+40 <br />sidewalks shall be restored per Redwood City standards. <br />Pipeline installation shall occur between 7:30AM to 4:30PM, M -F, <br />when the road may be closed. Any affected areas of paving and <br />Quartz Street <br />P1-70 <br />SFPUC Engineering <br />July, 2009 <br />STA 345+90 <br />sidewalks shall be restored per Redwood City standards. <br />Management Bureau <br />CCSF's Contractor shall conduct closed circuit television (CCTV) <br />inspection of 6 -inch existing sewer pipe which crosses the new <br />proposed pipeline in Quartz Street. <br />Pipeline installation shall occur between 7:30AM to 4:30PM, M -F, <br />when the road may be closed. Any affected areas of paving and <br />James Avenue <br />P1-71 <br />SFPUC Engineering <br />July, 2009 <br />STA 350+50 <br />sidewalks shall be restored per Redwood City standards. <br />Management Bureau <br />CCSF's Contractor shall conduct closed circuit television (CCTV) <br />inspection of 6 -inch existing sewer pipe which crosses the new <br />proposed pipeline in James Avenue. <br />Pipeline installation shall occur between 7:30AM to 4:30PM, M -F, <br />SFPUC Engineering <br />when the road may be closed. Any affected areas of paving and <br />Harding <br />P1-72 <br />Management Bureau <br />July, 2009 <br />STA 356+10 <br />sidewalks shall be restored per Redwood City standards. <br />Pipeline installation shall occur between 9:OOAM to 4:OOPM, M -F, <br />when the road may be closed. Any affected areas of paving and <br />Topaz <br />P1-73 <br />SFPUC Engineering <br />July, 2009 <br />STA 361+10 <br />sidewalks shall be restored per Redwood City standards. <br />Management Bureau <br />CCSF's Contractor shall conduct closed circuit television (CCTV) <br />inspection of 6 -inch existing sewer pipe which crosses the new <br />ro osed pipeline in Topaz Street. <br />Construction shall occur in one of three ways, mutually exclusive: <br />Alameda De Las Pulgas <br />P1-74 <br />SFPUC Engineering <br />Management Bureau <br />July, 2009 <br />STA 364+30 <br />1. During normal weekdays (M -F), between9:00AM to 4:OOPM <br />M -F, with on lane open during this period, and two lanes <br />o en at all other times. <br />Redwood City MOA 100318 PD JLO RH FINAL DOCn„a.. eed City N IO e 100309 nn J O R14.DOC- <br />