My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res11 15086
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res11 15086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:45:33 AM
Creation date
10/11/2019 7:45:14 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
1/24/2011
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE DOWNTOWN PRECISE PLAN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
01/24/2011 <br /> Exhibit. B <br /> Impact 9 -15: Cumulative Impact on Middlefield Road/Woodside Road <br /> Intersection. Under Cumulative With Project Conditions during both the AM and <br /> PM peak hour, this intersection would continue to operate at unacceptable LOS F. <br /> The additional project traffic would cause the critical delay to increase by more <br /> than five (5) seconds. <br /> a) Potential Impact. The impact identified above is described and discussed <br /> on pages 9 -58 to 9 -64 of the DEIR. <br /> b) Findings. Based on the FEIR and the entire record before the City, the <br /> City Council finds that: <br /> (i) Mitigation Measures. Mitigation Measure 9 -4 under Impact 9 -4 <br /> above would improve LOS but the intersection would continue to operate <br /> unacceptably, even though the change in the critical delay would be reduced to a <br /> less than signification level. However, any improvements within the Woodside <br /> Road right -of -way are within the responsibility and jurisdiction of Caltrans, and <br /> not within the jurisdiction or authority of the City. In addition, as discussed <br /> above, implementation of Mitigation Measure 9 -4 would conflict with newly <br /> adopted PED policies contained in the City's New General Plan by impeding <br /> pedestrian mobility across Woodside Road. Because the improvements required <br /> by Mitigation Measure 9 -4 are not within the City's jurisdiction and authority, <br /> and because they would conflict with the City's PED policies, this mitigation <br /> measure is deemed infeasible, and this impact is deemed to be significant and <br /> unavoidable. <br /> (ii) Remaining Impacts. Because there are no feasible mitigation <br /> measures available to mitigate the significant impact identified above, this impact <br /> is considered significant and unavoidable. <br /> (iii) Overriding Considerations. The environmental, social, <br /> economic and other benefits of the DPP override the significant adverse impacts <br /> of the DPP relating to the cumulative traffic impacts described above, as set forth <br /> in the Statement of Overriding Considerations below. <br /> Impact 9 -16: Cumulative Impact on Broadway/Walnut Street Intersection. <br /> Under Cumulative With Project Conditions during the PM peak hour, this <br /> intersection would continue to operate at an unacceptable LOS F. The additional <br /> project traffic would cause the critical delay to increase by more than five (5) <br /> seconds. <br /> a) Potential Impact. The impact identified above is described and discussed <br /> on pages 9 -58 to 9 -64 of the DEIR. <br /> b) Findings. Based on the FEIR and the entire record before the City, the <br /> City Council finds that: <br /> U: \Resolutions\2011 \Reso 15086 Exhibit B.doc 34 <br /> 012011 Reso. # 15086 <br /> Muff #601 <br />
The URL can be used to link to this page
Your browser does not support the video tag.