My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res11 15086
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res11 15086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:45:33 AM
Creation date
10/11/2019 7:45:14 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
1/24/2011
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE DOWNTOWN PRECISE PLAN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
01/24/2011 <br /> Exhibit B <br /> (1) Mitigation Measures. This impact could be mitigated to a less <br /> than significant level with the adoption of Mitigation Measure 9 -16 (page 9 -71 of <br /> the DEIR), which would require signalization of the intersection. However, the <br /> City's New General Plan adopted on October 11, 2010 includes PED policies <br /> intended to promote alternative modes of transportation in the DPP area, <br /> emphasizing pedestrian and bicycle travel and a reduction in the number of <br /> vehicle miles traveled within and by residents of the City. Mitigation Measure 9- <br /> 16 would conflict with these policies by impeding pedestrian mobility. In <br /> addition, as explained above, this potentially significant cumulative impact could <br /> be considered less than significant under the City's new LOS policies. Assuming, <br /> however, that this identified traffic increase represents a potentially significant <br /> cumulative impact, because implementing Mitigation Measure 9 -16 would <br /> conflict with the City's PED policies, this measure is deemed infeasible and this <br /> potentially significant cumulative impact is deemed to be significant and <br /> unavoidable. <br /> (ii) Remaining Impacts. Because there are no feasible mitigation <br /> measures available to mitigate the significant impact identified above, this impact <br /> is considered significant and unavoidable. <br /> (iii) Overriding Considerations. The environmental, social, <br /> economic and other benefits of the DPP override the significant adverse impacts <br /> of the DPP relating to the cumulative traffic impacts described above, as set forth <br /> in the Statement of Overriding Considerations below. <br /> Impact 9 -17: Cumulative Impact on Broadway /Chestnut Street Intersection. <br /> Under Cumulative With Project Conditions during the PM peak hour, this <br /> intersection would continue to operate at unacceptable LOS F. The additional <br /> project traffic would cause the critical delay to increase by more than five (5) <br /> seconds. <br /> a) Potential Impact. The impact identified above is described and discussed <br /> on pages 9 -58 to 9 -64 of the DEIR. <br /> b) Findings. Based on the FEIR and the entire record before the City, the <br /> City Council finds that: <br /> (i) Mitigation Measures. As described in Mitigation 9 -17 (page 9 -72 <br /> of the DEIR) this impact cannot be mitigated because the configuration of the <br /> intersection and the approaches to the intersection combined with the location of <br /> the existing railroad tracks make any proposed reconfiguration or improvements <br /> ineffective in reducing traffic delays and therefore infeasible. Therefore, this <br /> impact is deemed to be significant and unavoidable. <br /> (ii) Remaining Impacts. Because there are no feasible mitigation <br /> measures available to mitigate the significant impact identified above, this impact <br /> U: \Resolutions\2011\Reso 15086 Exhibit B.doc 35 <br /> 012011 Reso. # 15086 <br /> Muff #601 <br />
The URL can be used to link to this page
Your browser does not support the video tag.