Laserfiche WebLink
01/24/2011 <br /> Exhibit B <br /> is considered significant and unavoidable. <br /> (iii) Overriding Considerations. The environmental, social, <br /> economic and other benefits of the DPP override the significant adverse impacts <br /> of the DPP relating to the cumulative traffic impacts described above, as set forth <br /> in the Statement of Overriding Considerations below. <br /> Impact 9 -18. Cumulative Impact on Broadway/Woodside Road Intersection. <br /> Under Cumulative With Project Conditions during both peak periods, the <br /> intersection would continue to operate at unacceptable LOS F. The additional <br /> project traffic would cause the critical delay to increase by more than five (5) <br /> seconds. <br /> a) Potential Impact. The impact identified above is described and discussed <br /> on pages 9 -58 to 9 -64 of the DEIR. <br /> b) Findings. Based on the FEIR and the entire record before the City, the <br /> City Council finds that: <br /> (i) Mitigation Measures. Mitigation of this project impact could be <br /> achieved by Mitigation Measure 9 -5 (page 9 -51 of the DEIR) as discussed in <br /> Impact 9 -5 above. However, as discussed above, the changes required by <br /> Mitigation Measure 9 -5 are within the responsibility and jurisdiction of Caltrans, <br /> and can and should be adopted by Caltrans. Because implementation Mitigation <br /> Measure 9 -5 is outside of the City's jurisdiction, it is deemed infeasible and <br /> therefore this impact is deemed to be significant and unavoidable. <br /> (ii) Remaining Impacts. Because there are no feasible mitigation <br /> measures available to mitigate the significant impact identified above, this impact <br /> is considered significant and unavoidable. <br /> (iii) Overriding Considerations. The environmental, social, <br /> economic and other benefits of the DPP override the significant adverse impacts <br /> of the DPP relating to the cumulative traffic impacts described above, as set forth <br /> in the Statement of Overriding Considerations below. <br /> Impact 9 -19. Cumulative Impact on Bay Road/Woodside Road Intersection. <br /> Under Cumulative With Project Conditions during both the AM and PM peak <br /> hour, this intersection would continue to operate at unacceptable LOS F. The <br /> additional project traffic would cause the critical delay to increase by more than five <br /> (5) seconds for the PM peak hour. <br /> a) Potential Impact. The impact identified above is described and discussed <br /> on pages 9 -58 to 9 -64 of the DEIR. <br /> b) Findings. Based on the FEIR and the entire record before the City, the <br /> City Council finds that: <br /> U:\Resolutions\2011\Reso 15086 Exhibit B.doc 36 <br /> 012011 Reso. # 15086 <br /> Muff #601 <br />