My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res12 15218 rescinded by Res14 15331
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res12 15218 rescinded by Res14 15331
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:47:48 AM
Creation date
10/11/2019 7:47:45 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/10/2012
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING A PLANNED DEVELOPMENT PERMIT PURSUANT TO THE CITY OF REDWOOD CITY ZONING ORDINANCE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/10/2012 <br /> 34.An Address Plan shall be submitted for review and approval by the Chief <br /> Building Official or designee prior to the issuance of building permits. If a <br /> name for the private roadway is proposed, it will be subject to review and <br /> approval by the City Council in conjunction with action on the Final Map. <br /> Plans submitted for building permits for each house shall include the location <br /> of the property address posted on site. Numbers shall be illuminated, no less <br /> than four inches in height, and of a color contrasting with the background <br /> color of the surface on which they are attached. The location, size and color <br /> shall allow clear visibility from the public street. <br /> 35.Applicant shall obtain coverage under the General Construction Activity Storm <br /> Water Permit (General Construction Permit) issued by the State Water <br /> Resources Control Board (SWRCB), file a notice of intent (NOI) with the <br /> SWRCB and prepare a stormwater pollution prevention plan (SWPPP) for <br /> review and approval by the City's Engineering Division. <br /> 36.Applicant shall comply with the requirements of Provision C.3 of the National <br /> Pollutant Discharge Elimination System (NPDES) permit issued to the San <br /> Mateo Countywide Clean Water Program. The applicant shall submit with the <br /> application for a building permit (or other construction-related permit) a <br /> completed Construction-Permit-Phase Stormwater Supplemental Form to the <br /> Building Official. The project drawings submitted for the building permit (or <br /> other construction-related permit) shall contain a stormwater management <br /> plan, for review and approval by the City's Engineering Division, to manage <br /> stormwater run-off and to limit the discharge of pollutants in stormwater after <br /> construction of the project to the maximum extent practicable. <br /> a. The post-construction stormwater management plan shall include and <br /> identify the following: <br /> (i) All proposed impervious surFace on the site; and <br /> (ii) Anticipated directional flows of on-site stormwater runoff; and <br /> (iii) Site design measures to reduce the amount of impervious surface <br /> area and directly connected impervious surfaces; and <br /> (iv) Source control measures to limit the potential for stormwater <br /> pollution; and <br /> (v) Stormwater treatment measures to remove pollutants from <br /> stormwater runoff; and <br /> (vi) Hydromodification management measures so that post-project <br /> stormwater runoff does not exceed the flow and duration of pre- <br /> project runoff, if required under the NPDES permit. <br /> b. The following additional information shall be submitted with the post- <br /> construction stormwater management plan: <br /> ATTY/RES0.2784/FINGER RESO APPROVING PD FINAL RESO.#15218 <br /> REV:08-31-12 VR MUFF#613 <br /> Page 15 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.