My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:50:36 AM
Creation date
10/11/2019 7:50:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE STANFORD IN REDWOOD CITY PRECISE PLAN; ADOPTING CEQA FINDINGS; ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR EACH SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL IMPACT IDENTIFIED IN THE EIR; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/09/2013 <br /> Facts in Support of Finding: Implementation of Mitigation 15-5 would reduce potential <br /> expansive soils impacts to a less-than-significant level by requiring detailed, site- <br /> specific geotechnical investigations and solutions prepared by a registered <br /> engineering geologist or geotechnical engineer, with review and approval <br /> authority by the City Engineer. These facts are described in Draft EIR chapter 15 <br /> (Geology and Soils) on pages 15-1 through 15-15, which is hereby incorporated <br /> by reference. <br /> Impact: Impact 15-6: Seismically Induced Settlement. Development of the proposed <br /> project would place new commercial buildings in an area that could experience <br /> rapid, excessive settlement in response to earthquake-induced ground shaking <br /> during the useful life of the project improvements. <br /> Mitigation: Mitigation 15-6. The detailed, design-level geotechnical investigations required <br /> under Mitigation 15-1 for each project construction phase shall include a site- <br /> specific evaluation of the liquefaction and settlement potential at each proposed <br /> building location. The investigations shall also propose measures as needed to <br /> offset the effects of liquefaction-induced settlement, either through stabilization of <br /> the most vulnerable sand layers or through utilization of building foundation, <br /> utility connection, and pavement designs that can withstand the anticipated <br /> degree of total and differential settlement. <br /> Finding: Implementation of Mitigation 15-6 would reduce these potential seismically <br /> induced settlement impacts to a less-than-significant level. <br /> Facts in Support of Finding: Implementation of Mitigation 15-6 would reduce potential <br /> seismically induced settlement impacts to a less-than-significant level by <br /> requiring detailed, site-specific geotechnical investigations and solutions <br /> prepared by a registered engineering geologist or geotechnical engineer, with <br /> review and approval authority by the City Engineer. These facts are described in <br /> Draft EIR chapter 15 (Geology and Soils) on pages 15-1 through 15-15, which is <br /> hereby incorporated by reference. <br /> Hazards and Hazardous Materials <br /> Impact: Impact 12-1: Potential Project-Related Exposure to Existing Soil or <br /> Groundwater Contamination. Project-related excavation and construction <br /> activities, as well as project operations, could expose on-site construction and <br /> maintenance personnel and members of the public to existing soil and <br /> groundwater contamination. Recommendations included in the August 2008 <br /> draft Site Management Plan (SMP) commissioned by Stanford University for the <br /> Stanford development portion of the Precise Plan area identify the environmental <br /> issues associated with project development site construction activities (e.g., <br /> excavation, dewatering, etc.) and specify the contents of the site-specific, <br /> construction period Health and Safety Plan (HASP) that the construction <br /> contractor must prepare (a standard CaIOSHA requirement for work at <br /> hazardous waste sites). <br /> The SMP also explains that site conditions do not preclude any of the uses <br /> ATTY/RES0.2901/STANFORD EIR CERTIFICATION RESO.#15294 <br /> REV:09-10-13 VR MUFF#100 <br /> Page 20 of 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.