My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:50:36 AM
Creation date
10/11/2019 7:50:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE STANFORD IN REDWOOD CITY PRECISE PLAN; ADOPTING CEQA FINDINGS; ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR EACH SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL IMPACT IDENTIFIED IN THE EIR; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/09/2013 <br /> proposed, but that further risk assessment is required when the precise on-site <br /> locations and details of sensitive uses such as child care, medical clinics, and <br /> recreation areas are identified, so that any mitigation measures specific to the <br /> operations of such uses will be identified and implemented. Pending completion <br /> of the required supplemental risk assessments and identification of ineasures to <br /> ensure compliance with residential-level ESLs for these sensitive uses, the <br /> proposed project's impacts during operations from potential exposure to existing <br /> groundwater and soil vapor contamination are assumed to represent a potentially <br /> significant impact. <br /> Mitigation: Mitigation 12-1. The applicant shall implement the Site Management Plan (SMP) <br /> attached as an appendix to the Draft EIR. At such times as the exact locations <br /> and details of sensitive uses such as child care, medical clinics, and publicly <br /> accessible open space are identified, the applicant shall supplement the SMP to <br /> assess any risks to those uses from existing hazardous materials on the <br /> development site and shall identify any treatment measures required to ensure <br /> that risks to users remain below regulatory limits. <br /> Finding: Implementation of Mitigation 12-1 would reduce the potential impact of project- <br /> related exposure to existing soil and groundwater contamination to a less-than- <br /> significant level. <br /> Facts in Support of Finding: Implementation of Mitigation 12-1 would ensure that the Site <br /> Management Plan (SMP) included in Draft EIR appendix 21.6, as well as a <br /> Health and Safety Plan (HASP), are implemented during all project construction. <br /> Furthermore, once the precise locations and operations of proposed sensitive <br /> receptors--such as child care, medical clinics, and recreation--have been <br /> determined, additional investigations would be required to evaluate the presence <br /> and levels of any groundwater or soil vapor contamination, pursuant to applicable <br /> regulatory requirements. The mitigation for sensitive uses must meet residential <br /> screening criteria as defined by the appropriate regulatory agencies (e.g., <br /> RWQCB, DTSC, SMCHSA, BAAQMD, CaIOSHA). These facts are described in <br /> Draft EIR chapter 12 (Hazards and Hazardous Materials) on pages 12-1 through <br /> 12-24, and appendix 21.6 (Site Management Plan), which are hereby <br /> incorporated by reference. <br /> Noise <br /> Impact: Impact 13-1: Potential Exposure of Proposed Child Care Facility to Noise <br /> Levels Exceeding Standards. The Precise Plan includes a provision for a <br /> proposed child care center. The center's children, employees, and visitors could <br /> be exposed to various existing and projected noise sources, including U.S. 101 <br /> traffic. The compatibility of the child care land use with the existing and projected <br /> noise environment has been evaluated based on the Redwood City Noise <br /> Guidelines for Land Use Planning (see Draft EIR Table 13.4). New educational <br /> (e.g., child care) development is considered "satisfactory" in noise environments <br /> of less than 55 dBA CNEL. <br /> ATTY/RES0.2901/STANFORD EIR CERTIFICATION RESO.#15294 <br /> REV:09-10-13 VR MUFF#100 <br /> Page 21 of 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.