My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:50:36 AM
Creation date
10/11/2019 7:50:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE STANFORD IN REDWOOD CITY PRECISE PLAN; ADOPTING CEQA FINDINGS; ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR EACH SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL IMPACT IDENTIFIED IN THE EIR; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/09/2013 <br /> reach approximately 105 dBA, resulting in intermittent interference with typical <br /> existing residential and business activities, as well as any on-site sensitive uses <br /> developed during earlier phases of Precise Plan buildout. Construction noise <br /> could elevate noise levels at some locations (the nearest residences) by more <br /> than 5 dBA. <br /> Mitigation: Mitigation 13-2. Reduce project demolition- and construction-period noise <br /> impacts on nearby residences (including the Broadway Towers apartments and <br /> the mobile home park near the proposed recycled water pipeline route) and <br /> sensitive uses developed on the development site during earlier phases (e.g., <br /> child care center) by incorporating conditions in project demolition and <br /> construction contract agreements that stipulate the following conventional <br /> construction-period noise abatement measures: <br /> ■ Construction Plan. Prepare a detailed construction plan identifying the schedule for <br /> major noise-generating construction activities. The construction plan shall identify a <br /> procedure for coordination with nearby existing and on-site newly constructed noise- <br /> sensitive facilities so that construction activities can be scheduled to minimize noise <br /> disturbance. <br /> ■ Construction Scheduling. Ensure that noise-generating construction activity is limited to <br /> between the hours of 7:00 AM to 8:00 PM, Monday through Friday, and prohibit any <br /> construction during other hours which would cause any increase in ambient noise levels <br /> within a residential district. (Redwood City Municipal Code Section 24.32) <br /> ■ Construction Equipment Mufflers and Maintenance. Equip all internal combustion <br /> engine-driven equipment with intake and exhaust mufflers that are in good condition and <br /> appropriate for the equipment. <br /> ■ Equipment Locations. Locate stationary noise-generating equipment as far as possible <br /> from sensitive receptors when sensitive receptors adjoin or are near the construction <br /> site. <br /> ■ Construction Traffic. Route all construction traffic to and from the construction sites via <br /> designated truck routes where possible. Prohibit construction-related heavy truck traffic <br /> in residential areas where feasible. <br /> ■ Quiet Equipment Selection. Use quiet�: construction equipment, particularly air <br /> compressors, wherever possible. <br /> ■ Temporary Barriers. Construct solid plywood fences around construction areas to shield <br /> residences, operational businesses, or noise-sensitive land uses. <br /> • Temporary Noise Blankets. Temporary noise control blanket barriers should be erected, <br /> if necessary, along building facades or around construction areas. This mitigation would <br /> only be necessary if conflicts occurred which were irresolvable by proper scheduling. <br /> (Noise control blanket barriers can be rented and quickly erected.) <br /> ■ Noise Disturbance Coordinator. The City shall require project designation of a "Noise <br /> Disturbance Coordinator" who would be responsible for responding to any local <br /> ATTY/RE50.2901/STANFORD EIR CERTIFICATION RESO.#15294 <br /> REV:09-10-13 VR MUFF#100 <br /> Page 23 of 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.