Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE STANFORD IN REDWOOD CITY PRECISE PLAN; ADOPTING CEQA FINDINGS; ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR EACH SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL IMPACT IDENTIFIED IN THE EIR; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/09/2013 <br /> complaints about construction noise. The Disturbance Coordinator would determine the <br /> cause of the noise complaint (e.g., starting too early, bad muffler, etc.) and institute <br /> reasonable measures to correct the problem. Conspicuously post a telephone number <br /> for the Disturbance Coordinator at the consttuction site and include it in the notice sent <br /> to neighbors regarding the construction schedule. (The project sponsor could be <br /> responsible for designating a Noise Disturbance Coordinator, posting the phone number, <br /> and providing construction schedule notices; the Noise Disturbance Coordinator would <br /> work directly with an assigned City staff member. Alternatively, the Noise Disturbance <br /> Coordinator could be employed by the City and funded by the applicant.) <br /> ■ Temporary Closure or Relocation of Child Care Center. If the project construction <br /> sequencing results in major outdoor construction activities occurring adjacent to the child <br /> care center after it is in operation, then the project sponsor, at its option, shall either <br /> temporarily close or relocate the child care center. <br /> Finding: Implementation of Mitigation 13-2 would reduce construction noise impacts, but <br /> because this project likely would be constructed in phases over a long period of <br /> time, nearby sensitive receptors would be subjected to repeated construction <br /> noise, thereby resulting in a significant unavoidable construction noise <br /> impact. <br /> Facts in Support of Finding: Implementation of Mitigation 13-2 would reduce project-facilitated <br /> demolition and construction noise to the maximum extent feasible by requiring <br /> rigorous, coordinated procedures, scheduling, and equipment standards. <br /> However, because the project is likely to be constructed in phases over several <br /> years, this intermittent noise impact on nearby sensitive receptors (e.g., <br /> residences) is considered significant and unavoidable. These facts are described <br /> and quantified in Draft EIR chapter 13 (Noise) on pages 13-1 through 13-20, <br /> which is hereby incorporated by reference. <br /> Impact: Impact 13-3: Project-Facilitated Groundborne Vibration Levels. Project- <br /> facilitated demolition and construction activities could generate substantial <br /> vibration (e.g., from potential pile driving) in the project vicinity. <br /> Mitigation: Mitigation 13-3. Reduce groundborne vibration levels during individual, location- <br /> specific future project demolition and construction periods by incorporating <br /> conditions in individual project demolition and construction contractor <br /> agreements that stipulate the following groundborne vibration abatement <br /> measures: <br /> ■ Restrict vibration-generating activity to between the hours of 7:00 AM and <br /> 7:00 PM, Monday through Friday. Prohibit such activity on weekends and <br /> holidays. <br /> ■ If pile driving is proposed, prepare a vibration study. If the vibration study <br /> shows that pile driving, including mitigation such as pre-drilling of pile holes, <br /> would cause vibration exceeding 0.5 inches/sec ppv for structurally sound <br /> buildings designed to modern engineering standards or 0.2 inches/sec for <br /> structurally sound buildings for which structural damage is a major concern, <br /> then pile driving shall not be conducted. <br /> ATTY/RES0.2901/STANFORD EIR CERTIFICATION RESO.#15294 <br /> REV:09-10-13 VR MUFF#100 <br /> Page 24 of 55 <br />