My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:50:36 AM
Creation date
10/11/2019 7:50:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE STANFORD IN REDWOOD CITY PRECISE PLAN; ADOPTING CEQA FINDINGS; ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR EACH SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL IMPACT IDENTIFIED IN THE EIR; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/09/2013 <br /> through 7-70, Draft EIR appendix 21.3 (Supplemental Transportation <br /> Information), and Final EIR appendix A (Supplemental Traffic Information), which <br /> are hereby incorporated by reference. <br /> Impact: Impact 7-5: Near Term Plus Project Impact on Woodside Road/Broadway <br /> Intersection. Under Near Term Plus Project conditions during the PM peak hour, <br /> this intersection would continue to operate at LOS F, and project traffic would <br /> cause the critical delay to increase by 69.5 seconds. <br /> Mitigation: Mitigation 7-5. Implement Mitigation 7-1 (the project applicant would be <br /> responsible for fully funding/completing the mitigation). With these improvements, <br /> the level of service (LOS) at this intersection would remain at LOS F. Although <br /> the LOS F condition would exceed the City LOS standard, the LOS under Near <br /> Term Plus Project condition with this mitigation would be better than that under <br /> the Near Term Without Project condition. These improvements would enhance <br /> the overall perFormance of the intersection. <br /> Finding: Implementation of Mitigation 7-5 would reduce this project impact to a less-than- <br /> significant level. However, because implementation of this mitigation would <br /> require Caltrans approval, the City cannot ensure its construction. Without <br /> implementation of the proposed mitigation, the impact would be significant and <br /> unavoidable. <br /> Facts in Support of Finding: Implementation of Mitigation 7-5 would reduce the projecYs <br /> traffic impact at the Woodside Road/Broadway intersection to a less-than- <br /> significant level through a combination of roadway restriping, signage, modified <br /> traffic signal phasing, and based on Caltrans directives, possibly pedestrian <br /> count-down signals, an emergency vehicle pre-emption system, new corner radii <br /> to reduce pedestrian crossing distances, pedestrian median refuges, bike lanes, <br /> and bike detectors. However, the City cannot guarantee in advance that Caltrans <br /> will approve the mitigation, so the impact is currently considered significant and <br /> unavoidable. These facts are described in Draft EIR chapter 7 (Transportation, <br /> Circulation, and Parking) on pages 7-1 through 7-70, Draft EIR appendix 21.3 <br /> (Supplemental Transportation Information), and Final EIR appendix A <br /> (Supplemental Traffic Information), which are hereby incorporated by reference. <br /> Impact: Impact 7-6: Near Term Plus Project Impact on Woodside Road/Bay Road <br /> Intersection. Under Near Term Plus Project conditions during the PM peak hour, <br /> project traffic would cause this intersection to degrade from LOS D (44.9 seconds <br /> delay) to LOS F (91.1 seconds delay). <br /> Mitigation: Mitigation 7-6. Implement Mitigation 7-2 (the project applicant would be <br /> responsible for fully funding/completing the mitigation). <br /> Finding: Implementation of Mitigation 7-6 would improve the level of service (LOS) at this <br /> intersection to an acceptable LOS D in the PM peak hour, resulting in a /ess- <br /> than-significant impact. However, because implementation of this mitigation <br /> would require Caltrans approval, the City cannot ensure its construction. Without <br /> implementation of the proposed mitigation, the impact would be significant and <br /> unavoidable. <br /> ATTY/RES0.2901/STANFORD EIR CERTIFICATION RESO.#15294 <br /> REV:09-10-13 VR MUFF#100 <br /> Page 29 of 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.