My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:50:36 AM
Creation date
10/11/2019 7:50:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE STANFORD IN REDWOOD CITY PRECISE PLAN; ADOPTING CEQA FINDINGS; ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR EACH SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL IMPACT IDENTIFIED IN THE EIR; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/09/2013 <br /> westbound approaches on Broadway would need to be restriped to include a <br /> total of one left-turn, one through lane, and one shared through/right-turn lane. <br /> Parking (50 spaces) would need to be removed from all intersection legs to <br /> accommodate travel lanes. <br /> Finding: Implementation of Mitigation 7-3 would improve the level of service (LOS) at this <br /> intersection to an acceptable LOS B in the AM peak hour and an acceptable LOS <br /> C in the PM peak hour, resulting in a less-than-significant impact. <br /> Facts in Support of Finding: Implementation of Mitigation 7-3 would reduce the project's <br /> traffic impact at the Charter Street/Broadway intersection to a less-than- <br /> significant level through a combination of a traffic signal with protected phasing <br /> (to replace the current Stop signs) and roadway restriping. This mitigation would <br /> require the removal of 50 total parking spaces from Charter Street and <br /> Broadway. These facts are described in Draft EIR chapter 7 (Transportation, <br /> Circulation, and Parking) on pages 7-1 through 7-70, Draft EIR appendix 21.3 <br /> (Supplemental Transportation Information), and Final EIR appendix A <br /> (Supplemental Traffic Information), which are hereby incorporated by reference. <br /> Impact: Impact 7-4: Existing Plus Project Impact on Douglas Avenue/Broadway <br /> Intersection. Under Existing Plus Project conditions during the AM peak hour, <br /> project traffic would cause the intersection to degrade from LOS B (10.4 seconds <br /> delay) to LOS F (167.6 seconds). During the PM peak hour, project traffic would <br /> cause the intersection to degrade from LOS B (11.1 seconds) to LOS F (180.0 <br /> seconds). In addition, this intersection would have peak hour volumes large <br /> enough under both peak hours to satisfy the peak hour signal warrant. <br /> Mitigation: Mitigation 7-4. To mitigate the projecYs impact (i.e., the project applicant would <br /> be responsible for fully funding/completing the mitigation) at the intersection of <br /> Douglas Avenue and Broadway, the intersection would need to be signalized <br /> with protected phasing on all approaches. (Douglas Avenue is considered north- <br /> south and Broadway is considered east-west.) In addition to signalization, <br /> parking (15 spaces) would need to be removed from the north and south legs to <br /> accommodate additional travel lanes. The southbound approach would need to <br /> be restriped to include a total of one left-turn lane, one through lane, and one <br /> right-turn lane. The northbound approach would need to be restriped to include a <br /> total of two northbound left-turn lanes and one shared through/right-turn lane. <br /> The eastbound and westbound approaches would need to be restriped to include <br /> a total of one left-turn lane and one shared through/right-turn lane. <br /> Finding: Implementation of Mitigation 7-4 would improve the level of service (LOS) at this <br /> intersection to an acceptable LOS C during both peak hours, resulting in a /ess- <br /> than-significant impact. <br /> Facts in Support of Finding: Implementation of Mitigation 7-4 would reduce the project's traffic <br /> impact at the Douglas Avenue/Broadway intersection to a less-than-significant <br /> level through a combination of a traffic signal with protected phasing (to replace <br /> the current Stop signs) and roadway restriping. This mitigation would require the <br /> removal of 15 parking spaces from Douglas Avenue. These facts are described <br /> in Draft EIR chapter 7 (Transportation, Circulation, and Parking) on pages 7-1 <br /> ATTY/RES0.2901/STANFORD EIR CERTIFICATION RESO.#15294 <br /> REV:09-10-13 VR MUFF#100 <br /> Page 28 of 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.