My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:50:36 AM
Creation date
10/11/2019 7:50:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE STANFORD IN REDWOOD CITY PRECISE PLAN; ADOPTING CEQA FINDINGS; ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR EACH SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL IMPACT IDENTIFIED IN THE EIR; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/09/2013 <br /> through/right-turn lane. In addition, the signal phasing on the eastbound and <br /> westbound approaches would need to be modified from permitted phasing to <br /> protected phasing. Because this intersection is subject to Caltrans jurisdiction, <br /> any changes to the operation of the signal would require Caltrans approval. <br /> Pursuant to Caltrans Deputy Directives 64 and 64-R1, requiring facilitation of <br /> multimodal travel, it is possible that the above intersection improvements would <br /> also be required to include such features as new crosswalk and pedestrian <br /> signals across Bay Road on the west side of Woodside Road, restriping of two <br /> crosswalks on Woodside Road to provide straight and shorter walking distances, <br /> pedestrian median refuges on Woodside Road, curb ramps, pedestrian count- <br /> down signals, an emergency vehicle pre-emption system, reconstruction of <br /> corner radii to reduce pedestrian crossing distances, bike lanes, and bike <br /> detectors. <br /> Finding: Implementation of Mitigation 7-2 would improve the level of service (LOS) at this <br /> intersection to an acceptable LOS D in the PM peak hour, resulting in a /ess- <br /> than-significant impact. However, because this improvement would require <br /> Caltrans approval, the City cannot ensure the construction of this improvement. <br /> Without implementation of the proposed mitigation, the impact would be <br /> significanf and unavoidable. <br /> Facts in Support of Finding: Implementation of Mitigation 7-2 would reduce the project's traffic <br /> impact at the Woodside Road/Bay Road intersection to a less-than-significant <br /> level through a combination of roadway restriping and modified traffic signal <br /> phasing, and based on Caltrans directives, possibly new crosswalk and <br /> pedestrian signals, pedestrian crosswalk restriping, pedestrian median refuges, <br /> curb ramps, an emergency vehicle pre-emption system, new corner radii to <br /> reduce pedestrian crossing distances, bike lanes, and bike detectors. However, <br /> the City cannot guarantee in advance that Caltrans will approve the mitigation, so <br /> the impact is currently considered significant and unavoidable. These facts are <br /> described in Draft EIR chapter 7 (Transportation, Circulation, and Parking) on <br /> pages 7-1 through 7-70, Draft EIR appendix 21.3 (Supplemental Transportation <br /> Information), and Final EIR appendix A (Supplemental Traffic Information), which <br /> are hereby incorporated by reference. <br /> Impact: Impact 7-3: Existing Plus Project Impact on Charter Street/Broadway <br /> Intersection. Under Existing Plus Project conditions during the AM peak hour, <br /> project traffic would cause the intersection to degrade from LOS B (14.1 seconds <br /> delay) to LOS F (117.1 seconds delay). In the PM peak hour, project traffic <br /> would cause the intersection to degrade from LOS C (17.9 seconds delay) to <br /> LOS F (122.5 seconds delay). In addition, this intersection would have peak hour <br /> volumes large enough under both peak hours to satisfy the peak hour signal <br /> warrant. <br /> Mitigation: Mitigation 7-3. To mitigate the project's impact (i.e., the project applicant would <br /> be responsible for fully funding/completing the mitigation) at the intersection of <br /> Charter Street and Broadway, the intersection would need to be signalized with <br /> protected phasing on all approaches. The northbound and southbound <br /> approaches on Charter Street would need to be restriped to include a total of one <br /> left-turn lane and one shared through/right-turn lane. The eastbound and <br /> ATTY/RES0.2901/STANFORD EIR CERTIFICATION RESO.#15294 <br /> REV:09-10-13 VR MUFF#100 <br /> Page 27 of 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.