My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:50:36 AM
Creation date
10/11/2019 7:50:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE STANFORD IN REDWOOD CITY PRECISE PLAN; ADOPTING CEQA FINDINGS; ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR EACH SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL IMPACT IDENTIFIED IN THE EIR; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/09/2013 <br /> Mitigation: Mitigation 7-1. To mitigate the project's impact (i.e., the project applicant would <br /> be responsible for fully funding/completing the mitigation) at the intersection of <br /> Woodside Road and Broadway, the westbound approach on Broadway would <br /> need to be restriped to include a total of one left-turn lane, one through lane, one <br /> shared through/right-turn lane, and one right-turn lane. Signage would also need <br /> to be provided indicating that the "right-most" right-turn lane is to southbound US <br /> 101 only. In addition, the eastbound travel lanes would need to be restriped to <br /> include a total of two left-turn lanes and one shared through/right-turn lane. The <br /> eastbound and westbound signal phasing would need to be modified from split <br /> phasing to protected phasing. Because this intersection is subject to Caltrans <br /> jurisdiction, any changes to the operation of the signal or physical improvements <br /> to the intersection would require Caltrans approval. Pursuant to Caltrans Deputy <br /> Directives 64 and 64-R1, requiring facilitation of multimodal travel, it is possible <br /> that the above improvements to the intersection of Woodside Road and <br /> Broadway would also be required to include such features as pedestrian count- <br /> down signals, an emergency vehicle pre-emption system, reconstruction of <br /> corner radii to reduce pedestrian crossing distances, pedestrian median refuges, <br /> bike lanes, and bike detectors. <br /> Finding: Implementation of Mitigation 7-1 would restore the level of service (LOS) at this <br /> intersection to E or better, resulting in a /ess-than-significant impact. However, <br /> because this improvement would require Caltrans approval, the City cannot <br /> ensure the construction of this improvement. Without implementation of the <br /> proposed mitigation, the impact would be significant and unavoidable. <br /> Facts in Support of Finding: Implementation of Mitigation 7-1 would reduce the project's traffic <br /> impact at the Woodside Road/Broadway intersection to a less-than-significant <br /> level through a combination of roadway restriping, signage, modified traffic signal <br /> phasing, and based on Caltrans directives, possibly pedestrian count-down <br /> signals, an emergency vehicle pre-emption system, new corner radii to reduce <br /> pedestrian crossing distances, pedestrian median refuges, bike lanes, and bike <br /> detectors. However, the City cannot guarantee in advance that Caltrans will <br /> approve the mitigation, so the impact is currently considered significant and <br /> unavoidable. These facts are described in Draft EIR chapter 7 (Transportation, <br /> Circulation, and Parking) on pages 7-1 through 7-70, Draft EIR appendix 21.3 <br /> (Supplemental Transportation Information), and Final EIR appendix A <br /> (Supplemental Traffic Information), which are hereby incorporated by reference. <br /> Impact: Impact 7-2: Existing Plus Project Impact on Woodside Road/Bay Road <br /> Intersection. Under Existing Plus Project conditions during the PM peak hour, <br /> project traffic would cause the intersection to degrade from LOS D (35.5 seconds <br /> delay) to LOS F (81.7 seconds delay). <br /> Mitigation: Mitigation 7-2. To mitigate the projecYs impact (i.e., the project applicant would <br /> be responsible for fully funding/completing the mitigation) at the intersection of <br /> Woodside Road and Bay Road, the westbound approach on Bay Road would <br /> need to be restriped to include a total of two left-turn lanes and one shared <br /> through/right-turn lane. (Woodside Road is considered north-south and Bay Road <br /> is considered east-west.) The eastbound approach would need to be restriped to <br /> include a total of one left-turn lane, one through lane, and one shared <br /> ATTY/RE50.2901/STANFORD EIR CERTIFICATION RESO.#15294 <br /> REV:09-10-13 VR MUFF#100 <br /> Page 26 of 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.