My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:50:36 AM
Creation date
10/11/2019 7:50:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE STANFORD IN REDWOOD CITY PRECISE PLAN; ADOPTING CEQA FINDINGS; ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR EACH SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL IMPACT IDENTIFIED IN THE EIR; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/09/2013 <br /> require the removal of 15 parking spaces from Douglas Avenue. These facts are <br /> described in Draft EIR chapter 7 (Transportation, Circulation, and Parking) on <br /> pages 7-1 through 7-70, Draft EIR appendix 21.3 (Supplemental Transportation <br /> Information), and Final EIR appendix A (Supplemental Traffic Information), which <br /> are hereby incorporated by reference. <br /> Impact: Impact 7-10: Near Term Plus Project Impact on 5th Avenue/Bay Road <br /> Intersection. Under Near Term Plus Project conditions during the PM peak hour, <br /> project traffic would cause the intersection to degrade from LOS C (21.8 seconds <br /> delay) to LOS E (38.4 seconds delay). In addition, this intersection would have <br /> peak hour volume increases large enough under both peak hours to satisfy the <br /> peak hour signal warrant. <br /> Mitigation: Mitigation 7-10(a). The signalization of the 5th Avenue/Bay Road intersection is <br /> a transportation project included in the City's 2000 Traffic Impact Fee Program <br /> (TIF). Payment by the project applicant of its City Traffic Impact Fee in effect at <br /> time of payment and issuance of a building permit (or alternatively applicant's full <br /> funding or construction of the improvement, subject to potential reimbursement <br /> as provided in the Precise Plan) would mitigate this impact. To mitigate the <br /> project's impact at the intersection of 5th Avenue and Bay Road, the intersection <br /> would need to be signalized. (5th Avenue is considered north-south and Bay <br /> Road is considered east-west.) No further improvements would be required. <br /> or <br /> Mitigation 7-10(b). Mitigation of the project's impact at the intersection of 5th <br /> Avenue and Bay Road would require the conversion of the all-way stop <br /> controlled intersection to a single lane roundabout. The existing road widths at <br /> 5th Avenue and Bay Road would allow up to an 85-foot-diameter roundabout. If <br /> the design work shows that the 85-foot-diameter roundabout would not require <br /> the acquisition of additional right-of-way and would not create additional safety <br /> hazards for motorists, pedestrians, or bicyclists compared to Mitigation 7-10(a), <br /> and if substantial evidence at the time the roundabout is proposed shows that the <br /> roundabout would not divert traffic to other intersections, the roundabout shall be <br /> considered feasible and may be substituted for Mitigation 7-10(a). <br /> Finding: Implementation of Mitigation 7-10(a) would improve the level of service (LOS) at <br /> this intersection to an acceptable LOS B during both peak hours, resulting in a <br /> less-than-significant impact. <br /> or <br /> Implementation of Mitigation 7-10(b) would improve the level of service (LOS) at <br /> this intersection to an acceptable LOS A during both peak hours, resulting in a <br /> less-than-significant impact. <br /> Facts in Support of Finding: Implementation of either option for Mitigation 7-10 would reduce <br /> the project's traffic impact at the 5th Avenue/Bay Road intersection to a less-than- <br /> significant level. Mitigation option 7-10(a) requires the project's payment of its <br /> City Traffic Impact Fee to help fund signalization of the intersection (to replace <br /> the current Stop signs). Mitigation option 7-10(b) requires the design and <br /> ATTY/RES0.2901/STANFORD EIR CERTIFICATION RESO.#15294 <br /> REV:09-10-13 VR MUFF#100 <br /> Page 33 of 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.