My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:50:36 AM
Creation date
10/11/2019 7:50:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE STANFORD IN REDWOOD CITY PRECISE PLAN; ADOPTING CEQA FINDINGS; ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR EACH SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL IMPACT IDENTIFIED IN THE EIR; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/09/2013 <br /> Mitigation: Mitigation 7-12. To mitigate the project's contribution to the cumulative impact <br /> at the intersection of Veterans Boulevard and Woodside Road, an additional <br /> eastbound through lane would need to be added. (Woodside Road is considered <br /> north-south and Veterans Boulevard is considered east-west.) With these <br /> improvements, the level of service (LOS) at this intersection would improve to <br /> LOS E during the PM peak hour. Although LOS E still exceeds the City of <br /> Redwood City LOS standard, the LOS under Cumulative With Project conditions <br /> would be better than that under Cumulative No Project conditions. Widening of <br /> Veterans Boulevard between Chestnut and Woodside Road is included in the <br /> City's Traffic Impact Fee Program (TIF) project list. Accordingly, the applicant's <br /> payment of its Traffic Impact Fee in effect at time of payment and issuance of a <br /> building permit would mitigate the proposed project's contribution to the <br /> significant cumulative impact. However, because this improvement would require <br /> Caltrans approval, the City of Redwood City cannot ensure the construction of <br /> this improvement. <br /> Finding: Implementation of Mitigation 7-12 (applicant's payment of its Traffic Impact Fee) <br /> would mitigate the project's contribution to the cumulative impact to a /ess-than- <br /> significant level, but because this improvement (an additional eastbound through <br /> lane) would require Caltrans approval, the City of Redwood City cannot ensure <br /> the construction of this improvement. Therefore, without implementation of the <br /> proposed mitigation, the impact would be significant and unavoidable. <br /> Facts in Support of Finding: Implementation of Mitigation 7-12 would reduce the projecYs <br /> contribution to the cumulative traffic impact at the Veterans Boulevard/Woodside <br /> Road intersection to a less-than-significant level through the projecYs payment of <br /> its City Traffic Impact Fee to add an eastbound (Veterans Boulevard) through <br /> lane. However, the City cannot guarantee in advance that Caltrans will approve <br /> the mitigation, so the impact is currently considered significant and unavoidable. <br /> These facts are described in Draft EIR chapter 7 (Transportation, Circulation, and <br /> Parking) on pages 7-1 through 7-70, Draft EIR appendix 21.3 (Supplemental <br /> Transportation Information), and Final EIR appendix A (Supplemental Traffic <br /> Information), which are hereby incorporated by reference. <br /> Impact: Impact 7-13: Cumulative With Project Impact on Woodside Road/Bay Road <br /> Intersection. Under Cumulative With Project conditions during the PM peak <br /> hour, the intersection would degrade from LOS D to LOS F, and the proposed <br /> project could contribute up to 46.2 seconds of critical delay to the intersection. <br /> Mitigation: Mitigation 7-13. To mitigate the project's contribution to the cumulative impact <br /> at the intersection of Woodside Road and Bay Road, an additional westbound <br /> through lane would need to be added and the shared through/right-turn lane <br /> converted to a right-turn lane. (Woodside Road is considered north-south and <br /> Bay Road is considered east-west.) Traffic from the proposed project could add <br /> up to 46.2 seconds to the PM peak hour delay at this intersection over <br /> Cumulative No Project conditions (see Draft EIR Table 7.16); other Cumulative <br /> growth could add up to 3.4 seconds to the delay over Near Term No Project <br /> conditions. The proposed project would contribute its fair share to a mitigation <br /> fund established to pay for the cost of this improvement (estimated, based on the <br /> Draft EIR, to be 93 percent) at the time of issuance of a building permit or, if the <br /> ATTY/RES0.2901/STANFORD EIR CERTIFICATION RESO.#15294 <br /> REV:09-10-13 VR MUFF#100 <br /> Page 35 of 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.