My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:50:36 AM
Creation date
10/11/2019 7:50:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE STANFORD IN REDWOOD CITY PRECISE PLAN; ADOPTING CEQA FINDINGS; ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR EACH SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL IMPACT IDENTIFIED IN THE EIR; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/09/2013 <br /> areas should be moved if it is determined that flooding conditions are imminent. <br /> In addition, the existing Midpoint Technology Park development remains subject <br /> to Certified Mitigation 7-4 from the 1996 Midpoint Technology Park EIR. The <br /> applicable text of the mitigation states, "(I]f and when the City decides to improve <br /> the [downstream] storm drainage facility, the developer (or heirs) will be required <br /> to deposit funds with the City as `fair share' (for stormwater runoff impacts <br /> caused only by the new [i.e., Midpoint Technology Park] development) <br /> participation in the system's construction costs." <br /> Finding: Implementation of Mitigation 10-3 would reduce the identified flooding impact to a <br /> less-than-significant level. <br /> Facts in Support of Finding: Implementation of Mitigation 10-3 would reduce the project <br /> impact on flooding potential to a less-than-significant level through a combination <br /> of site design, architectural design, and engineering solutions subject to review <br /> and approval of the City Building, Infrastructure and Transportation Department, <br /> resulting in no net increase in off-site flooding compared to existing conditions. <br /> These facts are described and quantified in Draft EIR chapter 10 (Utilities), <br /> section 10.3 (Storm Drainage and Water Quality), on pages 10-23 through 10-36, <br /> which is hereby incorporated by reference. <br /> ATTY/RES0.2901/STANFORD EIR CERTIFICATION RESO.#15294 <br /> REV:09-10-13 VR MUFF#100 <br /> Page 44 of 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.