My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:50:36 AM
Creation date
10/11/2019 7:50:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE STANFORD IN REDWOOD CITY PRECISE PLAN; ADOPTING CEQA FINDINGS; ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR EACH SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL IMPACT IDENTIFIED IN THE EIR; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT D 09/09/2013 <br /> MONITORING VERIFICATION <br /> IDENTIFIED IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br /> Pe1'fOrmanCe Crlterla Entity Verification Entity Requirements <br /> project would contribute its fair share to a <br /> mitigation fund established to pay for the <br /> cost of this improvement(estimated,based <br /> on this EIR,to be 16 percent)at the time of <br /> issuance of a building permit or,if the City <br /> adds the improvements to its Traffic Impact <br /> Fee Program(TIF)project list,the <br /> proposed project would pay its Traffic <br /> Impact Fee in effect at time of payment and <br /> issuance of a building permit. <br /> With this mitigation,the projecYs <br /> contribution to this cumulative impact would <br /> be considered less-than-significant. <br /> However,because this improvement would <br /> require City of Menlo Park approval,the <br /> City of Redwood City cannot ensure the <br /> construction of this improvement. Without <br /> implementation of the proposed mitigation, <br /> the impact would be signii►cant and <br /> unavoidable. <br /> Impact 7-20: Existing Plus Project Impact Mitigation 7-20. To mitigate this impact Applicant to fully fund. City Prior to building <br /> on Pedestrian Facilities(Hurlingame/Bay (i.e.,the project applicant would be Applicant to construct. permit issuance for <br /> and Barron/Bay). Currently,two mid-block responsible for fully funding/completing the development on <br /> crosswalks along Broadway and one mitigation),additional high visibility adjacent parcels. <br /> crosswalk at Bay Road provide pedestrian crosswalks shall be created along Bay Refer to Stanford <br /> access in the Precise Plan area. Due to the Road that are aligned with the intersecting Precise Plan, <br /> limited existing pedestrian facilities on Bay streets. These crosswalks could include Chapter III, Phasing/ <br /> Road along the project frontage,the existing bulbouts,high visibility paint,paving Implementation <br /> pedestrian facilities could encourage textures/treatments,or pedestrian flashing Summary Table-- <br /> pedestrians to cross roads in undesignated warning light systems. These crosswalks item 7--for pedestrian <br /> areas. The addition of project-related would be installed at Hurlingame Avenue/ improvements timing <br /> pedestrian trips is therefore considered a Bay Road and Barron Avenue/Bay Road. and implementation. <br /> potentiallysignii►cant impact. These improvements would reduce this <br /> impact to a less-than-signii►cant level. <br /> AIR QUALITY <br /> Impact 8-1: Construction-Related Air Mitigation 8-1. For all project-related Applicant City Prior to grading <br /> Quality Impacts. Project-related demolition grading,demolition,or construction activity, permit issuance; <br /> and construction activities would generate construction contractors shall implement prior to building <br /> exhaust emissions and fugitive dust. These the following mitigation measures,where permit issuance;field <br /> emissions would not subject sensitive applicable: verify implementation <br /> receptors to substantial pollutant during grading and <br /> concentrations,but emissions of ROG and (a) BAAQMD-Recommended Measures for construction <br /> NOx could exceed BAAQMD daily All General Construction Activities: <br /> significance thresholds. This would <br /> represent a potentiallysignii►cantimpact. 1. All exposed surfaces(e.g., parking <br /> areas,sta in areas,soil iles, raded <br /> Page 15 �5 r 1106721FElRIMMRP Checklist(10672J.doc <br /> RESO. 15294 <br /> MUFF#100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.