Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE STANFORD IN REDWOOD CITY PRECISE PLAN; ADOPTING CEQA FINDINGS; ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR EACH SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL IMPACT IDENTIFIED IN THE EIR; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT D 09/09/2013 <br /> MONITORING VERIFICATION <br /> IDENTIFIED IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br /> Pe1'fOrmanCe Crlterla Entity Verification Entity Requirements <br /> contribution to a signii►cant cumulative Traffic from the proposed project could add Intersection <br /> impact. up to 6.7 seconds to the AM peak hour Improvements Table. <br /> delay at this intersection over Cumulative <br /> No Project conditions(see EIR Table 7.16); <br /> other Cumulative growth could add up to <br /> 89.8 seconds to the delay over Near Term <br /> No Project conditions. The proposed <br /> project would contribute its fair share to a <br /> mitigation fund established to pay for the <br /> cost of this improvement(estimated,based <br /> on this EIR,to be 7 percent)at the time of <br /> issuance of a building permit or,if the City <br /> adds the improvement to its Traffic Impact <br /> Fee Program(TIF)project list,the <br /> proposed project would pay its Traffic <br /> Impact Fee in effect at time of payment and <br /> issuance of a building permit. <br /> The proposed projecYs payment of its fair <br /> share toward these improvements would <br /> mitigate the projecYs contribution to the <br /> cumulative impact to a less-than- <br /> si nii►cant level. <br /> Impact 7-18: Cumulative With Project Mitigation 7-18. To mitigate the Applicant fair share or City; Menlo Park Prior to building <br /> Impact on Marsh Road/Scott Drive cumulative impact at the intersection of payment of Traffic permit issuance that <br /> Intersection. Under Cumulative With Project Marsh Road and Scott Drive,the Impact Fee would result in <br /> conditions during the PM peak hour,the eastbound approach of Scott Drive would 893,810 total square <br /> intersection,would remain at LOS F and the need to be restriped to include a total of feet in Precise Plan <br /> proposed project could contribute up to 14.4 one shared through/left-turn lane and one Blocks A-E. Refer to <br /> seconds of delay. The intersection of Marsh right-turn lane. (Marsh Road is considered Stanford Precise <br /> Road/Scott Drive is located in the City of north-south and Scott Drive is considered Plan, Chapter IV, <br /> Menlo Park. According to City of Menlo Park east-west.) With these improvements,the Intersection <br /> guidelines,this constitutes a cumulatively level of service(LOS)at this intersection Improvements Table. <br /> considerable contribution to a signii►cant would remain an unacceptable LOS F <br /> cumulative impact. during the PM peak hour. Although the <br /> LOS F still exceeds the City of Menlo Park <br /> LOS standard,the LOS under Cumulative <br /> With Project conditions would be better <br /> than that under Cumulative No Project <br /> conditions. <br /> Traffic from the proposed project could <br /> contribute up to 14.4 seconds to the PM <br /> delay at this intersection over Cumulative <br /> No Project conditions(see EIR Table 7.16); <br /> other Cumulative growth could add up to <br /> 74.4 seconds to the delay over Near Term <br /> No Pro�ect conditions. The ro osed <br /> Page 14 �4 r 1106721FElRIMMRP Checklist(10672J.doc <br /> RESO. 15294 <br /> MUFF#100 <br />