My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:50:36 AM
Creation date
10/11/2019 7:50:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE STANFORD IN REDWOOD CITY PRECISE PLAN; ADOPTING CEQA FINDINGS; ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR EACH SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL IMPACT IDENTIFIED IN THE EIR; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT D 09/09/2013 <br /> MONITORING VERIFICATION <br /> IDENTIFIED IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br /> Pe1'fOrmanCe Crlterla Entity Verification Entity Requirements <br /> greater. This could be achieved in a <br /> number of ways: <br /> 1. Install fewer than the assumed 13 new <br /> generators; <br /> 2. Install generators with lower emissions <br /> (in this case,smaller generators); <br /> 3. Test new generators at lower running <br /> loads(the analysis assumed 100-percent <br /> load,so 50-percent load would reduce <br /> emissions);and/or <br /> 4. Reduce the number of annual testing <br /> hours. <br /> The applicant shall submit an analysis of <br /> the new generator emissions prior to <br /> installing more than five new generators at <br /> the project development site. <br /> Implementation of this measure to reduce <br /> generator emissions would reduce ROG <br /> emissions by 2.7 pounds per day,which <br /> would result in total ROG emissions of 53.1 <br /> pounds per day,which is below the <br /> BAAQMD significance threshold of 54 <br /> pounds per day. However,this mitigation <br /> measure would reduce PM,o emissions by <br /> a minimal amount,leaving PM,o emissions <br /> above the BAAQMD significance threshold. <br /> Therefore,as currently proposed,the <br /> project would result in a signii►cant <br /> unavoidable project and cumulative <br /> o erational air ualit im act. <br /> Impact 8-3: Community Risk and Hazard Mitigation 8-3. Buffer the child care center Applicant City Prior to PC permit <br /> Impacts. Project development could expose from existing and planned emission issuance; prior to <br /> attendees of the on-site child care center to sources,and include project features to building permit <br /> significant levels of PMZ.S. Significant reduce TAC and PMZ.S exposure from air issuance; prior to <br /> impacts from the Tyco Thermal Controls pollutant sources--which include US 101 occupancy permit <br /> Facility to attendees of the proposed child traffic,the Tyco Thermal Controls facility, issuance <br /> care facility are anticipated to be significant and existing and proposed generators-- <br /> regardless of where the child care facility is through the following measures: <br /> located within the Precise Plan area. This <br /> project-related effect is considered to 1. When construction of a child care <br /> represent a signii►cant project and center is proposed,conduct site- <br /> cumulative im act. specific detailed analysis to determine <br /> Page 20 20 r 1106721FElRIMMRP Checklist(10672J.doc <br /> RESO. 15294 <br /> MUFF#100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.