My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:50:36 AM
Creation date
10/11/2019 7:50:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE STANFORD IN REDWOOD CITY PRECISE PLAN; ADOPTING CEQA FINDINGS; ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR EACH SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL IMPACT IDENTIFIED IN THE EIR; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT D 09/09/2013 <br /> MONITORING VERIFICATION <br /> IDENTIFIED IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br /> Pe1'fOrmanCe Crlterla Entity Verification Entity Requirements <br /> operation at the time of construction of <br /> the child care center,and if the detailed <br /> analysis described above shows PMZ.S <br /> levels exceeding the 0.3�ag/m3 <br /> standard throughout the development <br /> site,construction and operation of a <br /> child care center on the development <br /> site shall be prohibited. If the detailed <br /> analysis shows that some or all of the <br /> development site would be exposed to <br /> PMZ.S levels lower than 0.3�ag/m3,the <br /> outdoor use area for the child care <br /> center shall be sited in one of those <br /> locations. <br /> Implementation of these measures would <br /> reduce this impact to a less-than- <br /> si nii►cant level. <br /> CLIMATE CHANGE <br /> Impact 9-1: Sea Level Rise Impacts on Mitigation 9-1. For all new development Applicant City Prior to grading <br /> Project Development. Based on the BCDC on the project development site,the City permit issuance; <br /> sea level rise maps,the project may be shall ensure that the development complies prior to building <br /> affected by anticipated sea level rise and with the most current Redwood City permit issuance;field <br /> associated changes in broader flood plain General Plan and Redwood City Municipal verify implementation <br /> boundaries. Potential impacts associated Code requirements for protection from during grading and <br /> with future development that may be subject flood hazards,consistent with Mitigation construction <br /> to sea level rise include risk to public safety 10-3 in chapter 10(Utilities),of this EIR. <br /> and property damage,representing a These provisions would require compliance <br /> potentiallysignii►cant impact. with associated storm drainage storage, <br /> building elevation,and flood-proofing <br /> requirements. Implementation of these <br /> measures would be expected to reduce this <br /> im act to a less-than-si nii►cant level. <br /> UTILITIES <br /> Impact 10-1: Need for Emergency Potable Mitigation 10-1. Based on the projected Applicant fair share City Prior to building <br /> Water Storage. Project development would emergency potable water storage permit issuance for <br /> require emergency potable water storage per requirement for the proposed project,the net new <br /> City requirements. Because the project applicant shall contribute the funds development,to be <br /> infrastructure(e.g.,water tank and equivalent to the cost of providing 490 implemented <br /> distribution system)necessary to meet this equivalent dwelling units(EDU)($1.5 proportionately as <br /> requirement has not been incorporated as a million in 2011 dollars)of emergency net new development <br /> component of the proposed project,the need potable water storage towards the design occurs. Refer to <br /> for emergency potable water storage and construction of the planned off-site Stanford Precise <br /> represents a potentiallysignii►cant project areawide storage facility. Implementation Plan, Chapter III, <br /> im act. of this measure would reduce the identified Phasing/ <br /> Page 22 22 r 1106721FElRIMMRP Checklist(10672J.doc <br /> RESO. 15294 <br /> MUFF#100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.