Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE STANFORD IN REDWOOD CITY PRECISE PLAN; ADOPTING CEQA FINDINGS; ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR EACH SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL IMPACT IDENTIFIED IN THE EIR; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT D 09/09/2013 <br /> MONITORING VERIFICATION <br /> IDENTIFIED IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br /> Pe1'fOrmanCe Crlterla Entity Verification Entity Requirements <br /> project sponsor,at its option,shall <br /> either temporarily close or relocate the <br /> child care center. <br /> Although implementation of these <br /> measures would reduce construction noise <br /> impacts, it is likely that this large project <br /> would be constructed in phases over a long <br /> period of time,subjecting nearby sensitive <br /> receptors to repeated construction noise. <br /> Therefore,the construction noise impact of <br /> the proposed project is considered <br /> si nii►cant and unavoidable. <br /> Impact 13-3: Project-Facilitated Mitigation 13-3. Reduce ground borne Applicant City Prior to grading <br /> Groundborne Vibration Levels. Project- vibration levels during individual, location- permit issuance; <br /> facilitated demolition and construction specific future project demolition and prior to building <br /> activities could generate substantial vibration construction periods by incorporating permit issuance;field <br /> (e.g.,from potential pile driving)in the project conditions in individual project demolition verify implementation <br /> vicinity. These possible intermittent and and construction contractor agreements during grading and <br /> short-term effects represent a potentially that stipulate the following groundborne construction <br /> significantimpact. vibration abatement measures: <br /> • Restrict vibration-generating activity to <br /> between the hours of 7:00 AM and 7:00 <br /> PM,Monday through Friday. Prohibit <br /> such activity on weekends and <br /> holidays. <br /> • If pile driving is proposed, prepare a <br /> vibration study. If the vibration study <br /> shows that pile driving, including <br /> mitigation such as pre-drilling of pile <br /> holes,would cause vibration exceeding <br /> 0.5 inches/sec ppv for structurally <br /> sound buildings designed to modern <br /> engineering standards or 0.2 <br /> inches/sec for structurally sound <br /> buildings for which structural damage is <br /> a major concern,then pile driving shall <br /> not be conducted. <br /> Implementation of these measures would <br /> reduce this potential intermittent and short- <br /> term project vibration impact to a less- <br /> than-significant level. <br /> Page 29 29 r 1106721FElRIMMRP Checklist(10672J.doc <br /> RESO. 15294 <br /> MUFF#100 <br />