My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:50:36 AM
Creation date
10/11/2019 7:50:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE STANFORD IN REDWOOD CITY PRECISE PLAN; ADOPTING CEQA FINDINGS; ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR EACH SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL IMPACT IDENTIFIED IN THE EIR; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT D 09/09/2013 <br /> MONITORING VERIFICATION <br /> IDENTIFIED IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br /> Pe1'fOrmanCe Crlterla Entity Verification Entity Requirements <br /> Impact 13�: Potential Noise from Parking Mitigation 13�. During the project Applicant City Prior to building <br /> Structure Ventilation System. Noise detailed design phase for the potential permit issuance; <br /> generated solely by the ventilation system parking structure at the corner of Bay Road prior to occupancy <br /> and other mechanical equipment for the and Barron Avenue,the project applicant permit issuance <br /> potential parking structure at the corner of shall submit an acoustical study to <br /> Bay Road and Barron Avenue could demonstrate how the parking structure <br /> substantially exceed existing ambient levels design would meet the following noise <br /> at residences in the area or the Redwood standards at the most affected receiver: 60 <br /> City Noise Guidelines for Land Use Planning dBA CNEL and 60 dBA Leq-hr daytime(7:00 <br /> (see Table 13.4)because the parking AM to 7:00 PM),55 dBA Leq-hr evening <br /> structure would be located proximate to (7:00 PM to 10:00 PM),and 50 dBA Leq-hr <br /> residences on 2"d Avenue. This possibility nighttime(10:00 PM to 7:00 AM). The <br /> represents a potentiallysignii►cantimpact. design measures may include,for example, <br /> the installation of silencers and baffles as <br /> necessary to reduce the noise level at the <br /> nearest residential property line to the <br /> existing ambient noise level. <br /> Implementation of this measure to the <br /> satisfaction of the Redwood City <br /> Community Development Department <br /> would reduce this impact to a less-than- <br /> si nii►cant level. <br /> CULTURAL AND HISTORIC RESOURCES <br /> Impact 14-2: Potential Disturbance of Mitigation 14-2. The project applicant Applicant City Prior to grading <br /> Archaeological or Paleontological shall carry out the following measures, permit issuance; <br /> Resources. Project construction(e.g., which shall be at least as protective as prior to building <br /> excavation for underground parking and those listed in the City's Cultural Resources permit issuance;field <br /> utilities)could disturb existing unrecorded Management Plan: verify implementation <br /> sensitive archaeological or paleontological during grading and <br /> resources at the development site. Although (1) Construction Personnel Education construction <br /> unlikely,this possibility represents a Program. The project applicant shall <br /> potentiallysignii►cant impact. implement an education program, prepared <br /> by a qualified archaeologist and a qualified <br /> paleontologist,for construction personnel <br /> that includes the following elements: <br /> • Resource identification training <br /> procedures for construction personnel; <br /> • Procedures for coordinating work with <br /> the archaeological monitor(see below); <br /> and <br /> • Procedures for reporting discoveries. <br /> (2) Procedures for Resources <br /> Encountered Durin Construction. The <br /> Page 30 30 r 1106721FElRIMMRP Checklist(10672J.doc <br /> RESO. 15294 <br /> MUFF#100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.