My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:50:36 AM
Creation date
10/11/2019 7:50:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE STANFORD IN REDWOOD CITY PRECISE PLAN; ADOPTING CEQA FINDINGS; ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR EACH SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL IMPACT IDENTIFIED IN THE EIR; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT D 09/09/2013 <br /> MONITORING VERIFICATION <br /> IDENTIFIED IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br /> Pe1'fOrmanCe Crlterla Entity Verification Entity Requirements <br /> recover micro vertebrate fossils. If <br /> significant fossils are found and collected, <br /> they shall be prepared to a reasonable <br /> point of identification. Excess sediment or <br /> matrix shall be removed from the <br /> specimens to reduce the bulk and cost of <br /> storage. Itemized catalogs of material <br /> collected and identified shall be provided to <br /> a museum repository with the specimens. <br /> Significant fossils collected during this <br /> work,along with the itemized inventory of <br /> these specimens,shall be deposited in a <br /> museum repository for permanent curation <br /> and storage. A report documenting the <br /> results of the monitoring and salvage <br /> activities,and the significance of the <br /> fossils, if any,shall be prepared.The report <br /> and inventory,when submitted to the lead <br /> agency,shall signify the completion of the <br /> program to mitigate impacts on <br /> paleontological resources. <br /> Implementation of these measures would <br /> reduce this impact to a less-than- <br /> signii►cant level. <br /> GEOLOGYAND SOILS <br /> Impact 15-1: Geotechnical Hazards Mitigation 15-1. As recommended by the Applicant City Prior to grading <br /> Associated with Project Excavation and projecYs preliminary geotechnical permit issuance; <br /> Grading. The projecYs proposed excavation investigations,prior to City issuance of prior to building <br /> and grading activities have the potential to grading permits for individual project permit issuance;field <br /> destabilize existing buried utilities and construction phases,the applicant shall be verify implementation <br /> building foundations,or to create conditions required to retain a registered engineering during grading and <br /> that would potentially compromise the safety geologist or geotechnical engineer to construction <br /> or stability of proposed project improvements. prepare detailed,design-level geotechnical <br /> The project applicanYs preliminary investigations to guide the design of all <br /> geotechnical investigations(Lowney Reports project grading and excavation activities. <br /> I and II;and Cornerstone Earth Group, March The detailed,design-level geotechnical <br /> 2008)made initial assessments of these investigations shall be performed for each <br /> conditions, but a design-level geotechnical of the structures proposed for the <br /> investigation will be needed to adequately development site. Subsurface conditions <br /> address all grading and excavation activities shall be explored and laboratory tests <br /> on the development site. Without such a conducted on selected soil samples to <br /> study--and without the associated supervision establish strength parameters for the <br /> of an engineering geologist or geotechnical design of excavations, retained slopes and <br /> engineer during project grading and fill placement,and to determine the <br /> construction--the safety and long-term corrosive potential of both Bay mud and <br /> stabilit of existin and ro osed ro�ect imported fill on foundation elements and <br /> Page 32 32 r 1106721FElRIMMRP Checklist(10672J.doc <br /> RESO. 15294 <br /> MUFF#100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.