My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:50:36 AM
Creation date
10/11/2019 7:50:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE STANFORD IN REDWOOD CITY PRECISE PLAN; ADOPTING CEQA FINDINGS; ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR EACH SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL IMPACT IDENTIFIED IN THE EIR; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT D 09/09/2013 <br /> MONITORING VERIFICATION <br /> IDENTIFIED IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br /> Pe1'fOrmanCe Crlterla Entity Verification Entity Requirements <br /> improvements cannot be assured. These buried utilities. Recommendations from the <br /> possible excavation and grading hazards investigations shall be incorporated into all <br /> represent a potentiallysignii►cantimpact plans for project grading,excavation,soil <br /> support(both temporary and long-term) <br /> and utility construction,to the satisfaction <br /> of the City Engineer. <br /> The detailed,design-level investigations, <br /> relevant recommendations,and all <br /> associated project grading,excavation and <br /> foundation plans,shall be subject to review <br /> and approval by an independent <br /> engineering geologist or geotechnical <br /> engineer retained by the City Engineer at <br /> applicant expense. In addition,the project <br /> civil engineer shall certify to the City <br /> Engineer(e.g.,through plan submittal for <br /> City review)that all relevant provisions of <br /> the investigations have been incorporated <br /> into the grading,excavation and <br /> construction plans,and all earthwork and <br /> site preparation shall be performed under <br /> the direct supervision of a registered <br /> engineering geologist or geotechnical <br /> engineer. Implementation of these <br /> measures would reduce the potential <br /> excavation and grading impacts to a less- <br /> than-si nii►cant level. <br /> Impact 15-2: Excavation Instabilities Mitigation 15-2. The detailed,design-level Applicant City Prior to grading <br /> Caused by High Groundwater. geotechnical investigations recommended permit issuance; <br /> Groundwater encountered during under Mitigation 15-1 for each project prior to building <br /> construction of the proposed projecYs below- construction phase shall fully characterize permit issuance;field <br /> grade installations could destabilize groundwater conditions on the verify implementation <br /> excavation walls, reduce the bearing capacity development site and make appropriate during grading and <br /> of in-place soils that might otherwise be recommendations regarding dewatering construction <br /> suitable for foundation support,and exert techniques,slope and shoring <br /> additional stresses on basement walls and requirements for excavations,stabilization <br /> floor slabs. These possible groundwater- or replacement of saturated foundation <br /> related construction problems represent a materials,and hydrostatic pressure <br /> potentiallysignii►cant impact. implications for the design of below-grade <br /> structures. <br /> Implementation of these measures would <br /> reduce these potential groundwater <br /> impacts to a less-than-signii►cant level. <br /> Impact 15-3: Soil Erosion. Project Mitigation 15-3. The applicant shall Applicant City Prior to grading <br /> develo ment would disturb the site's existin develo an erosion control lan in permit issuance; <br /> Page 33 33 r 1106721FElRIMMRP Checklist(10672J.doc <br /> RESO. 15294 <br /> MUFF#100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.