Laserfiche WebLink
09/21/2015 <br />ATTY/RESO.3134/CC RESO APPROVING PLANNED DEVELOPMENT – FINGER RESO. # 15445  <br />REV: 09‐17‐15 VR  MUFF # 613  <br />Page 5 of 29  <br />Section 3. Top of Bank: The City Council finds that: <br /> <br />(a) Section 2.2 of the City’s Zoning Ordinance defines the Top of Bank as: <br /> <br />The line where a distinct change in grade between the ravine of a creek or <br />waterway and the surrounding topography is apparent. Where the top of <br />banks are not distinguishable, the top of banks shall be as determined by <br />the Engineering and Construction Division based on the adjacent slopes <br />and/or the extent of riparian vegetation. <br /> <br />(b) Upon review of the Applicant’s proposed top of bank location, the <br />Kamman/Friends’ proposed top of bank location, and a site visit to <br />physically observe the creek and top of bank, the City of Redwood City <br />agrees with and has accepted the Kamman/Friends’ top of bank location <br />as being accurate, for the reasons set forth in the letter issued by the City <br />of Redwood City, dated October 2, 2014. <br /> <br />(c) The letter issued by the City of Redwood City, dated October 2, 2014 shall <br />constitute the City’s final determination of the accurate location of the top <br />of bank of Cordilleras Creek. <br /> <br />Section 4. Planned Development PD2008-06: The City Council finds that: <br /> <br />(a) The eight lot residential development, subject to the conditions of approval <br />listed below, would be consistent with, conform to the intent of, and would <br />appropriately implement Zoning Ordinance Article 46 (Planned <br />Development) because: <br /> <br />1. It closely reflects the character of the surrounding neighborhood; <br />2. It would promote the most functional and aesthetic relationships <br />between building structures, open space and parking areas, <br />particularly between the proposed development and existing adjacent <br />homes; <br />3. It would incorporate the highest quality architectural solutions, building <br />materials and landscaping concepts; and <br />4. It would incorporate stormwater treatment provisions in site planning, <br />including a minimum 25 feet of vegetated pervious area between any <br />proposed buildings and impervious surfaces and the top of bank of <br />Cordilleras Creek. <br /> <br />(b) While the project site is an irregularly shaped parcel (refer to Finger <br />Project EIR Figure 1.0-3), an eight lot subdivision design and associated <br />building placement would provide an environment of physical and <br />functional desirability in harmony with the character of the surrounding <br />neighborhood. The two smallest residential parcels would front directly <br />onto Finger Avenue and would be similarly sized to the adjacent (5,000 - <br />6,000 square foot) neighboring parcels. In order to provide a consistent