My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res15 15458
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res15 15458
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:54:03 AM
Creation date
10/11/2019 7:53:58 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
11/16/2015
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY DENYING THE APPEALS AND APPROVING A VESTING TENTATIVE MAP, DOWNTOWN PLANNED COMMUNITY PERMIT INCLUDING ONE GUIDELINE DEVIATION, AND PARKING IN- LIEU FEE APPLICATION FOR 601 MARSHALL STREET PURSUANT TO THE CITY OF REDWOOD CITY'S DOWNTOWN PRECISE PLAN AND SUBDIVISION ORDINANCE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11/16/2015 <br /> 21. Backflow protection on fire protection water services shall be required. The backflow <br /> preventer shall be above grade, and shall be located on private property, accessible <br /> to the Public Works division from the outside for testing. <br /> 22. Recycled water facilities shall be provided and designed in accordance with <br /> Engineering Standards for dual plumbing, irrigation and other warranted uses <br /> pursuant to the Recycled Water Ordinance, Chapter 38, Article VIII of the Municipal <br /> Code. Upon a final determination by the City that recycled water is available for the <br /> property, the Applicant shall complete an application to use recycled water as <br /> provided in the ordinance. <br /> 23. Dual plumbing is required for this project. The purple pipes shall be "roughed in" <br /> because recycled water service shall be provided by the City at a later date at a <br /> pressure of 50-55 pounds per square inch at the service meters. The building shall <br /> be designed so that recycled water plumbing fixtures on all floors of the building and <br /> irrigations systems for landscaping property function at this delivery pressure. <br /> 24. If required by the Public Works Department, the applicant shall hire an engineer <br /> licensed in California and experienced in the field of wastewater treatment to prepare <br /> a report pursuant to California Water Code section 13522.5 and in accordance with <br /> California Code of Regulations sections 60314 and 60323 (found within Title 22, <br /> Division 4, Chapter 3). The report shall be submitted with the first building submittal, <br /> and will be routed to the Public Works Department for review and coordination. <br /> 25. Due to the use of recycled water on the site, backflow protection on domestic water <br /> services shall be required. <br /> 26. Redwood City has exceeded its Peak Wet Weather Flow (PWWF) capacity in the <br /> past. A methodology to reduce inflow and infiltration by pipe replacement was <br /> determined. The applicant shall reduce inflow and infiltration to offset increased <br /> sewer demand from the project by replacing aged sewer mains or pay an equivalent <br /> in-lieu fee. The length of pipe replacement required or the amount of fee will be <br /> based on the project's sewage generation projection (Attachment L of the City's <br /> Engineering Standards). <br /> 27. Grading shall be performed in accordance with Volume III, Part II of the City's <br /> Engineering Standards (http://www.redwoodcitv.orq/home/showdocument?id=2428). Soil <br /> or other construction materials shall not be stockpiled in the public right-of-way. <br /> Applicant shall submit cut/fill volumes (CY) for all soils to be imported to or exported <br /> from the site. <br /> 28. Post-construction runoff into the storm drain shall not exceed pre-construction runoff <br /> levels. The applicant's design professional shall evaluate the project's impact to the <br /> ATfY/RES0.3157/SA RESO 601 MARSHALL APPEAL 8-STORY PROJECT RESO.#15458 <br /> REV:11-16-15 VR MUFF#603 <br /> Page 11 of 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.