My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res17 15582
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res17 15582
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:56:14 AM
Creation date
10/11/2019 7:56:10 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/8/2017
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE CALIFORNIA WAY WATER TANK, PUMP STATION AND PIPELINE PROJECT; ADOPTION OF CEQA FINDINGS; AND ADOPTION OF A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT AND SELECTING THE HILLSIDE ALTERNATIVE PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mitigation Monitoring and Reporting Program - Hillside Alternative <br />Mitigation Monitoring and Reporting Program <br />EXHIBIT B <br />Impact <br />Mitigation Measure <br />Implementation <br />Monitoring Verified <br />Construction activities could <br />(e.g., jackhammers, pavement breakers, and <br />and Timing <br />Responsibility Implementation <br />expose the public to noise <br />outfitted and maintained with noise- <br />incorporate this <br />shall review all <br />levels in excess of standards <br />reduction devices to minimize construction- <br />noise mitigation <br />appropriate bid, Date: <br />established in the City's <br />generated noise. Equipment and delivery <br />measure into all <br />contract, and <br />General Plan and/or Noise <br />trucks shall not be left to idle for longer <br />appropriate bid, <br />engineering and site <br />Ordinance. <br />than a few minutes. Stationary construction <br />contract, and <br />(building, grading, <br />equipment shall be located on-site at the <br />engineering and site <br />improvement plans) <br />greatest distance possible from nearby <br />plan (e.g. building, <br />documents for inclusion <br />noise -sensitive receptors. If during <br />grading, <br />of this noise reduction <br />construction, noise levels at the property <br />improvement plans) <br />measure. <br />boundary exceed the City's noise ordinance <br />documents. <br />The City shall <br />standard of 110 dB, the construction <br />Timing: Prior to <br />periodically inspect the <br />contractor and/or City shall erect temporary <br />any ground- <br />site to ensure the <br />attenuating buffers to shield adjacent <br />disturbing activities, <br />construction process <br />properties from noise exceeding the <br />unless otherwise <br />incorporates this noise <br />established standard. The attenuating <br />specified. <br />control measure into <br />buffers may be removed as soon as the <br />daily operations. <br />construction noise levels fall under 110 dB <br />at the property boundary. <br />IMPACT NOI-1: <br />Mitigation Measure N0I-2: Impact tools <br />Implementation: <br />Monitoring: The City's Initials: <br />Construction activities could <br />(e.g., jackhammers, pavement breakers, and <br />The City shall <br />Engineering Division <br />expose the public to noise <br />rock drills), if used for project construction, <br />incorporate this <br />shall review all Date: <br />levels in excess of standards <br />shall be hydraulically or electrically <br />noise mitigation <br />appropriate bid, — <br />established in the City's <br />powered wherever possible to avoid noise <br />measure into all <br />contract, and <br />General Plan and/or Noise <br />associated with compressed -air exhaust <br />appropriate bid, <br />engineering and site <br />Ordinance. <br />from pneumatically powered tools. <br />contract, and <br />(building, grading, <br />However, where use of pneumatic tools is <br />engineering and site <br />improvement plans) <br />unavoidable, an exhaust muffler on the <br />plan (e.g. building, <br />documents for inclusion <br />compressed -air exhaust shall be used; such <br />grading, <br />of this noise reduction <br />mufflers can lower noise levels from the <br />improvement plans) <br />measure. <br />exhaust by up to 10 dBA. External jackets <br />documents. <br />The City shall <br />on the tools themselves shall be used where <br />Timing: Prior to <br />periodically inspect the <br />feasible, which could achieve a reduction of <br />any ground- <br />site to ensure the <br />5 dBA. Quieter procedures shall be used, <br />disturbing activities, <br />construction process <br />California Water Tank and Pump Station Final EIR - February 2017 <br />City ofRedwood City <br />Page 10 of 11 <br />ATTY/RESO.0017/PC RESO RECOMMENDING CERTIFY EIR- CALIFORNIA WAY WATER TANK <br />
The URL can be used to link to this page
Your browser does not support the video tag.