My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res17 15582
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res17 15582
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:56:14 AM
Creation date
10/11/2019 7:56:10 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/8/2017
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE CALIFORNIA WAY WATER TANK, PUMP STATION AND PIPELINE PROJECT; ADOPTION OF CEQA FINDINGS; AND ADOPTION OF A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT AND SELECTING THE HILLSIDE ALTERNATIVE PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mitigation Monitoring and Reporting Program - Hillside Alternative EXHIBIT B <br />Mitigation Monitoring and Reporting Program <br />Impact Mitigation Measure Implementation Monitoring Verified <br />and Timing Responsibility Implementation <br />such as drills rather than impact equipment, unless otherwise incorporates this noise <br />whenever feasible. specified. control measure into <br />daily operations. <br />IMPACT N0I-1: <br />Mitigation Measure N0I-3: Construction <br />Implementation: <br />Monitoring: The City's Initials: <br />Construction activities could <br />activities shall be limited to the hours of <br />The City shall <br />Engineering Division <br />expose the public to noise <br />7:00 a.m. and 4:00 p.m., Monday through <br />incorporate this <br />shall review all Date: <br />levels in excess of standards <br />Friday, which is more restrictive than the <br />noise mitigation <br />appropriate bid, <br />established in the City's <br />noise ordinance requirements. Signs <br />measure into all <br />contract, and <br />General Plan and/or Noise <br />required by the noise ordinance shall reflect <br />appropriate bid, <br />engineering and site <br />Ordinance. <br />the more restrictive construction hour <br />contract, and <br />(building, grading, <br />limitation and also include a day and <br />engineering and site <br />improvement plans) <br />evening contact number for the job site and <br />plan (e.g. building, <br />documents for inclusion <br />a day and evening contact number for the <br />grading, <br />of this noise reduction <br />City in the event of problems or excessive <br />improvement plans) <br />measure. <br />noise complaints. If the City receives more <br />documents. <br />The City shall <br />than 10 noise complaints during one week, <br />Timing: Prior to <br />periodically inspect the <br />the City shall conduct noise measures while <br />any ground- <br />site to ensure the <br />construction is occurring to determine the <br />disturbing activities, <br />construction process <br />exact level of noise and whether it exceeds <br />unless otherwise <br />incorporates this noise <br />the noise ordinance standards. If the noise <br />specified. <br />control measure into <br />ordinance standards are being exceeded, the <br />daily operations. <br />City shall work with the contractor to <br />devise a strategy to bring noise levels into <br />compliance including erection of <br />attenuating buffers as described in NOI-1. <br />California Water Tank and Pump Station Final EIR -February 2017 <br />City gfRedwood City <br />Page 10 of 11 <br />ATTY/RESO.0017/PC RESO RECOMMENDING CERTIFY EIR-CALIFORNIAWAY WATER TANK <br />
The URL can be used to link to this page
Your browser does not support the video tag.