Laserfiche WebLink
Mitigation Monitoring and Reporting Program -Hillside Alternative <br />IMPACT GEO-1: Mitigation Measure GEO-1: <br />Construction may impact slope <br />stability for both temporary cut <br />slopes during construction and <br />the long-term stability of the <br />permanent cut slopes under <br />seismic conditions. <br />Prepare a detailed geotechnical report to <br />address slope stability and follow the <br />geotechnical engineer's recommendations in <br />the design of the project to achieve <br />acceptable factors of safety under seismic <br />conditions. <br />Implementation: <br />Monitoring: <br />The City shall <br />The City's Engineering <br />retain a <br />Division shall ensure <br />geotechnical <br />the geotechnical report <br />engineer to prepare <br />recommendations are <br />a detailed <br />included in the design <br />geotechnical report. <br />documents and <br />The engineer's <br />implemented during <br />recommendations <br />construction. <br />shall be <br />incorporated in the <br />construction <br />documents. <br />Timing: during the <br />detailed design <br />phase and during <br />construction. <br />California Water Tank and Pump Station Final EIR —February 2017 <br />City ofRedwood City <br />Initials: <br />Date: <br />EXHIBIT <br />Page 10 of 11 <br />ATTY/RESO.0017/PC RESO RECOMMENDING CERTIFY EIR —CALIFORNIA WAY WATER TANK <br />