My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res17 15582
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res17 15582
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:56:14 AM
Creation date
10/11/2019 7:56:10 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/8/2017
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE CALIFORNIA WAY WATER TANK, PUMP STATION AND PIPELINE PROJECT; ADOPTION OF CEQA FINDINGS; AND ADOPTION OF A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT AND SELECTING THE HILLSIDE ALTERNATIVE PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
05/08/2017 <br />be in good health and should be from local stock if feasible. Minimum size for <br />replacement trees shall be a 15- gallon container. Irrigation shall be installed to <br />ensure newly planted trees receive appropriate watering for the species. Newly <br />planted trees shall also be protected from deer browse. Replacement trees shall <br />be monitored for at least five years and shall be re -planted if they die. <br />The City will integrate the replacement trees into the project's final landscape <br />plan. Should the landscape plan not be able to accommodate all of the required <br />mitigation trees without over -crowding the site, the City shall provide the <br />remaining number of mitigation trees to the Redwood City Tree Bank Fund for <br />planting in other parts of the City. The mitigation trees shall be planted within 12 <br />months of project completion, in a suitable site where long-term survival is likely. <br />The mitigation trees shall be monitored for a five-year period and shall be re- <br />planted if they die. <br />Impact: BIO -5: The proposed project could damage trees to be retained during project <br />construction. <br />Mitigation: BIO -5: The following tree protection measures shall be included in the project in <br />order to protect trees (including mature trees) to be retained during construction: <br />• Damage to any tree during construction shall be reported to the City's <br />Landscape Architect, and project contractors shall treat the tree for damage <br />in the manner specified by the City's Landscape Architect. <br />• No construction equipment, vehicles or materials shall be stored, or parked <br />within the tree dripline. <br />• Cutting and filling around the base of trees shall be done only after <br />consultation with the City Landscape Architect and then only to the extent <br />authorized by the City Landscape Architect. <br />• No waste construction materials or wastewater shall be dumped on the <br />ground between the dripline and the base of the tree or uphill from any tree <br />where certain substances might reach the roots through a leaching process. <br />• Barricades shall be constructed around the trunks of trees as specified by <br />the City Landscape Architect to prevent injury to trees making them <br />susceptible to disease causing organisms. <br />• The City Landscape Architect shall inspect the perimeter of the area of <br />ground disturbance and pipeline alignments within the site to determine <br />whether construction could damage the roots of retained trees. The <br />Landscape Architect shall make appropriate recommendations to ensure the <br />roots of retained trees are not significantly damaged. <br />Impact: 13I0-6: Project construction could result in the spread of invasive, non-native <br />French broom or other invasive plants on the site. <br />Mitigation: 13I0-6: French broom (Genista monspessulana) stands or other invasive plants <br />on the site shall be removed from the site outside of the blooming period (April <br />through June for French broom) and removed plants shall be bagged or placed <br />in a covered container (dumpster or covered truck) and disposed of at a landfill. <br />Page 6 of 28 <br />ATTY/ RESO.0043/CC RESO HILLSIDE ALTERNATIVE PROJECT RESO. NO. 15582 <br />REV: 05-06-17 PR MUFF NO. 802 <br />
The URL can be used to link to this page
Your browser does not support the video tag.