My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res17 15582
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res17 15582
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:56:14 AM
Creation date
10/11/2019 7:56:10 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/8/2017
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE CALIFORNIA WAY WATER TANK, PUMP STATION AND PIPELINE PROJECT; ADOPTION OF CEQA FINDINGS; AND ADOPTION OF A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT AND SELECTING THE HILLSIDE ALTERNATIVE PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
05/08/2017 <br />removed from the pump station building with the remaining paint stabilized. <br />• The impact of lead to the demolition project should be minimal; however, Cal <br />OSHA worker protection rules, California Department of Public Health <br />certification requirements, US EPA standards, and Department of Toxic <br />Substance Control disposal requirements need to be assessed by each <br />contractor/employer who performs work on this project. <br />• Any work performed at the site where Lead Based Paint or Lead Containing <br />Paint is likely to be disturbed should be performed by a contractor trained <br />and qualified to perform lead -related construction work. Any work that <br />exceeds Cal OSHA's permissible exposure limit or is performed to remediate <br />a lead hazard must be conducted by California Department of Public Health <br />certified personnel. All lead related work shall be conducted employing lead <br />work practices in accordance with United States Department of Housing and <br />Urban Development (US HUD) guidelines. <br />HAZ-2: Excavation and grading shall avoid potential serpentine rock when <br />feasible. If serpentine must be graded, the top 2 feet of soil shall be replaced <br />with clean soil, so as to avoid impacts from Naturally Occurring Asbestos <br />(NOA). Soils with NOA shall be removed and disposed of at an appropriate <br />facility, to the satisfaction of the City Engineer. Dust shall be suppressed during <br />grading, and a dust control plan to minimize exposure to NOA (per the <br />BAAQMD regulations) shall be submitted to the County Health System's <br />Department Environmental Health. <br />Finding: Implementation of Mitigations HAZ-1 and HAZ-2 would reduce the construction - <br />related impact of exposure to hazardous materials to a less than significant level. <br />Facts in Support of Finding: These mitigation measures are consistent with best <br />management practice to reduce exposure to hazardous materials during construction. <br />Implementing the recommendations from the above noted pre -demolition evaluation and <br />covering any exposed serpentine rock with two feet of soil will reduce the risk of accidental <br />release of hazardous materials at the project site and ensure the public or environment is not <br />exposed to significant hazards. <br />.• - <br />Impact: N0I-1: Construction activities could expose the public to noise levels in <br />excess of standards established in the City's General Plan and/or Noise <br />i Ordinance. <br />Mitigations: NOI-1: Construction equipment shall be properly outfitted and maintained with <br />noise -reduction devices to minimize construction -generated noise. Equipment <br />and delivery trucks shall not be left to idle for longer than a few minutes. <br />Stationary construction equipment shall be located on-site at the greatest <br />distance possible from nearby noise -sensitive receptors. If during construction, <br />noise levels at the property boundary exceed the City's noise ordinance <br />standard of 110 dB, the construction contractor and/or City shall erect temporary <br />attenuating buffers to shield adjacent properties from noise exceeding the <br />Page 8 of 28 <br />ATTY/ RESO.0043/CC RESO HILLSIDE ALTERNATIVE PROJECT RESO. NO. 15582 <br />REV: 05-06-17 PR MUFF NO. 802 <br />
The URL can be used to link to this page
Your browser does not support the video tag.