My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res17 15632
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res17 15632
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:57:27 AM
Creation date
10/11/2019 7:57:05 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/4/2017
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY APPROVING THE EL CAMINO REAL CORRIDOR PLAN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ms. Lindy Chan Page 5 October 27, 2017 <br />Street Conversion Opportunities <br />El Camino Real cuts through the grid pattern of the City streets at a slightly offset angle, especially those to the <br />east of El Camino Real. These street segments intersect the corridor at acute angles, and result in broad swaths of <br />pavement that are not part of the travelway, short and redundant street segments (approximately 50 feet in <br />length), and small triangular shaped islands. These streets and intersections are non-standard with awkward <br />geometrics and consist of underutilized pavement that could opportunistically be converted into landscaped <br />areas that provide a traffic calming effect on El Camino Real and simplify circulation for drivers. Following are <br />recommendations for the street conversion opportunities. <br /> El Camino Real Southbound from Edgewood Road to Claremont Avenue (See Figure 1) <br />o Move the existing lane merge from three through lanes to two through lanes to a segment to <br />the north, preferably between St. Francis Way and Eaton Avenue <br />o Remove frontage road with diagonal parking and existing floating island bus stop <br />o Reconstruct this area to provide a large plaza area and a new bus stop <br />o The number of existing driveways could be reduced but still allow for full access to the <br />businesses, and would result in fewer conflicts with the one-way protected bike facility
The URL can be used to link to this page
Your browser does not support the video tag.