Laserfiche WebLink
Ms. Lindy Chan Page 6 October 27, 2017 <br /> El Camino Real at Redwood Avenue-Main Street (See Figure 2) <br />o Reconstruct the intersection by relocating the Main Street leg to align with the existing Redwood <br />Avenue leg <br />o Close access to and from Spruce Street at Main Street to vehicle traffic <br />o Rededicate the remaining right-of-way as a result of reconfiguring this area to construct a plaza, <br />which could be used for gateway treatments, including trees and signs <br />o The turn radii would be reduced to reduce vehicle turning speeds into and out of the side streets <br />o Install protected intersection treatments and provide cross-bikes along El Camino Real <br />o Install a traffic signal <br /> El Camino Real – Woodside Road Overcrossing (See Figure 2) <br />o Due to the constraints of the existing Woodside Road bridge, bicycles would need to be <br />conveyed through this area via shared wide sidewalks that would accommodate one-way bike <br />traffic and pedestrians.