My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res18 15661
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res18 15661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:59:20 AM
Creation date
10/11/2019 7:59:12 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/7/2018
Description
A RESOLUTION OF THE CITY COUNCIL CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE 1548 MAPLE STREET PROJECT; ADOPTING CEQA FINDINGS; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Facts in Support of Findina: This mitigation measure identifies the process for the <br />preparation and approval of construction management plan that would include best <br />management practices that would be required to be included for reducing impacts to <br />vehicular, bicycle, pedestrian, and transit circulation. <br />Impact TRA -3: Development of the proposed project and the project variant, <br />combined with cumulative development in the defined geographic area, including past, <br />present, existing, approved, pending, and reasonably foreseeable future development, <br />would contribute a considerable amount of traffic and increase the average vehicle delay by <br />more than the five seconds at Broadway/Woodside Road/US 101 Southbound Off -Ramp <br />(Intersection #6) during the AM peak hour. <br />Mitigation TRA -3: Additional capacity along the Woodside Road corridor shall be <br />added and improvements to the US 101/SR 84 interchange shall be made pursuant to the <br />US 101/SR 84 Interchange Improvement Project. The project applicant shall contribute its <br />fair share contribution to the improvements. Concurrent with future building permit <br />applications, the City shall ensure that the required fair -share payment has been submitted. <br />Finding: Implementation of Mitigation Measure TRA -3 would reduce project -related <br />and cumulative impacts to vehicle delay at Intersection #6 to a less -than -significant level. <br />Facts in Support of Finding: This mitigation measure appropriately identifies fair share <br />contributions by the project applicant to assist in the addition of capacity along the Woodside <br />Road corridor and improvement to the US 101/SR 84 interchange, pursuant to the US <br />101/SR 84 Interchange Improvement Project. <br />Impact TRA -4: Development of the proposed project and the project variant, <br />combined with cumulative development in the defined geographic area, including past, <br />present, existing, approved, pending, and reasonably foreseeable future development, <br />would contribute a considerable amount of traffic to Blomquist Street/Seaport <br />Boulevard/East Bayshore Road (Intersection #8) and increase the delay by more than the <br />five seconds in the PM peak hour. <br />Mitigation TRA -4: The existing right-of-way shall be restriped to add a second <br />westbound left turn pocket on East Bayshore Road and to extend the existing turn pockets. <br />This modification is included in the TIF project list. The project applicant shall contribute its <br />fair share to this improvement. Concurrent with future building permit applications, the City <br />shall ensure that the required transportation impact mitigation fee has been submitted. <br />Finding: Implementation of Mitigation Measure TRA -4 would reduce project -related <br />and cumulative impacts related to the addition of a considerable amount of traffic to <br />Intersection #8 and an increase in vehicle delay by more than five seconds to a less -than - <br />significant level. <br />AT FY/RESO.0035/CC RESO CERTIFYING FINAL EIR —1548 MAPLE RESO. NO. 15661 <br />REV: 04-30-18 PR MUFF NO. 601 <br />Page 11 of 49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.