Laserfiche WebLink
Facts in Su000rt of Findina; This mitigation measure appropriately identifies fair <br />share payment by the project applicant to add a second westbound left turn pocket on East <br />Bayshore Road and to extend the existing turn pockets, which are modifications included in <br />the TIF project list. <br />AIR QUALITY <br />Impact AIR -1: Construction of the proposed project and the project variant would <br />generate air pollutant emissions that could violate air quality standards. <br />Mitigation AIR -1: Consistent with guidance from the BAAQMD, the project <br />contractor shall ensure the following Basic Construction Mitigation Measures are <br />implemented through all construction contracts and specifications for the project: <br />All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, <br />and unpaved access roads) shall be watered two times per day. <br />All haul trucks transporting soil, sand, or other loose material off-site shall be <br />covered. <br />All visible mud or dirt tracked -out onto adjacent public roads shall be removed using <br />wet power vacuum street sweepers at least once per day. The use of dry power <br />sweeping is prohibited. <br />. All vehicle speeds on unpaved roads shall be limited to 15 mph. <br />All roadways, driveways, and sidewalks to be paved shall be completed as soon as <br />possible. Building pads shall be laid as soon as possible after grading unless <br />seeding or soil binders are used. <br />Idling times shall be minimized either by shutting equipment off when not in use or <br />reducing the maximum idling time to 5 minutes (as required by the California <br />airborne toxics control measure Title 13, Section 2485 of California Code of <br />Regulations [CCR]). Clear signage shall be provided for construction workers at all <br />access points. <br />All construction equipment shall be maintained and properly tuned in accordance <br />with manufacturer's specifications. All equipment shall be checked by a certified <br />mechanic and determined to be running in proper condition prior to operation. <br />A publicly visible sign shall be posted with the telephone number and person to <br />contact at the City of Redwood City regarding dust complaints. This person shall <br />respond and take corrective action within 48 hours. The BAAQMD phone number <br />shall also be visible to ensure compliance with applicable regulations. <br />Finding: Implementation of Mitigation Measure AIR -1 would reduce the project - <br />related impacts related to air quality standards to a less -than -significant level. <br />ATTY/RESO.0035/CC RESO CERTIFYING FINAL EIR-1548 MAPLE <br />REV: 04-30-18 PR <br />Page 12 of 49 <br />RESO. NO. 15661 <br />MUFF NO. 601 <br />