My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res18 15661
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res18 15661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:59:20 AM
Creation date
10/11/2019 7:59:12 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/7/2018
Description
A RESOLUTION OF THE CITY COUNCIL CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE 1548 MAPLE STREET PROJECT; ADOPTING CEQA FINDINGS; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LSA ASSOCIATES. INC. <br />APRIL 2018 <br />1548 MAPLE STREET PROJECT <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />Table 1: Mitigation Monitoring <br />and Reporting Program <br />Timeframe for Responsibility for <br />Oversight of <br />Impact <br />Mitigation Measures <br />Implementation Implementation <br />Implementation <br />13I0-2 Continued <br />BI0-2b: For any dewatering that could occur during the <br />During all phases Project Applicant <br />Redwood City <br />construction period, all discharge water shall be pumped <br />of construction <br />Community <br />into a temporary siltation pond/desilting basin, Baker tank, <br />I <br />Development <br />or similar detention device for settling of sediments prior to <br />Director <br />their release downstream in accordance with the approved <br />Stormwater Pollution Prevention Plan. <br />BI0-2c: Excavated material shall not be placed on aquatic <br />During all phases Project Applicant <br />Redwood City <br />vegetation, or allowed to fall or be transported into <br />of construction <br />Community <br />Redwood Creek. <br />Development <br />Director <br />13I0 -2d: Silt -trapping devices shall be used to minimize <br />During all phases Project Applicant <br />Redwood City <br />downstream sedimentation. <br />of construction <br />Community <br />Development " <br />Director <br />13I0 -2e: Rock riprap in low -flow channels shall only be <br />During all phases Project Applicant <br />Redwood City <br />used where riprap is determined to be the only feasible <br />of construction <br />Community <br />stabilization approach. Individual bank stabilization <br />Development <br />activities using rock riprap shall not exceed 500 feet in <br />Director <br />length along the bank, and the amount of riprap used shall <br />not exceed I cubic yard per running foot placed along the <br />bank below the ordinary high water mark without specific <br />authorization from the applicable resource agency. <br />13I0-3: Construction activities <br />BI0-3a: Prior to the initiation of construction activities <br />Prior to any Project Applicant <br />Redwood City <br />associated with the proposed <br />(including demolition, and staging) all personnel associated <br />construction <br />Community <br />project and the project variant <br />with project construction shall attend an Environmental <br />activities <br />Development <br />could interfere with the <br />Awareness Training. The training should be conducted by a <br />Director <br />movement or habitat quality of <br />qualified biologist, to aid workers in recognizing special - <br />white -tailed kite and longfin <br />status resources that may occur in the project area. The <br />smelt, <br />specifics of this program should include identification of <br />the special -status species and habitats, a description of the <br />regulatory status, and review of the measures required to <br />reduce impacts to biological resources on the project site. <br />Each worker shall be given a handout with key points. At <br />the end of the training, all workers should sign to document <br />their participation in the program and understanding of the <br />measures. <br />BIO -3 Continued <br />13I0 -3b: No pets or firearms shall be allowed at the project <br />During all phases Project Applicant <br />Redwood City <br />ATTY/RESO.0035/CC RESO CERTIFYING FINAL EIR-1548 MAPLE <br />RESO. NO. 15661 <br />REV: 04-30-18 PR <br />MUFF NO. 601 <br />Page 27 of 49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.