My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res18 15661
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res18 15661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:59:20 AM
Creation date
10/11/2019 7:59:12 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/7/2018
Description
A RESOLUTION OF THE CITY COUNCIL CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE 1548 MAPLE STREET PROJECT; ADOPTING CEQA FINDINGS; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LSA ASSOCIATES, INC. <br />APRIL 2018 <br />Table 1: Mitigation Monitoring and Reporting Program <br />Impact <br />Mitigation Measures <br />site, with the exception of authorized law enforcement <br />personnel. <br />1548 MAPLE STREET PROJECT <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />Timeframe for Responsibility for <br />Implementation Implementation <br />of construction <br />BI0-3c: All food -related trash that may attract predators and During all phases Project Applicant <br />vermin shall be properly contained and removed from the of construction <br />work site daily. <br />BI0-3d: All refueling, maintenance, and staging of <br />During all phases <br />equipment and vehicles shall occur at least 100 feet from <br />of construction <br />the top of bank of Redwood Creek. Secondary containment <br />shall be used during refueling. A spill prevention plan shall <br />be in place prior to the initiation of demolition or construction <br />activities. <br />BI0-3e: All vehicles and equipment shall be maintained in <br />During all phases <br />good working condition and free of leaks. <br />of construction <br />BI0-3f: Standard Best Management Practices (BMPs) shall During all phases <br />be employed to avoid degradation of aquatic habitat by of construction <br />maintaining water quality and controlling erosion and <br />sedimentation during construction as required by <br />compliance with the General National Pollution Discharge <br />Elimination System Permit for Construction Activities. <br />BMPs shall include, but not be limited to, installation of silt <br />fencing and erosion control wattles between Redwood <br />Creek and construction activities. <br />BIO -3e: To prevent the entanglement of wildlife, no During all phases <br />erosion control devices containing plastic monofilament of construction <br />netting shall be used or stored on site. <br />ATTY/RESO.0035/CC RESO CERTIFYING FINAL EIR-1548 MAPLE <br />REV: 04-30-18 PR <br />Page 28 of 49 <br />RE50. NO. 15661 <br />MUFF NO. 601 <br />Project Applicant <br />Project Applicant <br />Project Applicant <br />Project Applicant <br />Oversight of <br />Implementation <br />Community <br />Development <br />Director <br />Redwood City <br />Community <br />Development <br />Director <br />Redwood City <br />Community <br />Development <br />Director <br />Redwood City <br />Community <br />Development <br />Director <br />Redwood City <br />Community <br />Development <br />Director <br />Redwood City <br />Community <br />Development <br />Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.