My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res18 15661
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res18 15661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:59:20 AM
Creation date
10/11/2019 7:59:12 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/7/2018
Description
A RESOLUTION OF THE CITY COUNCIL CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE 1548 MAPLE STREET PROJECT; ADOPTING CEQA FINDINGS; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LSA ASSOCIATES, INC. <br />APRIL 2018 <br />Table 1: Mitigation Monitoring and Reporting Program <br />Impact <br />Mitisation Measures <br />CUL -1 Continued <br />The following tasks shall be undertaken during and after the <br />Water Tank's relocation: <br />• The relocation shall be implemented in accordance with <br />the approved Relocation Plan and all required City <br />noticing and permitting requirements. <br />• The Water Tank shall be reconstructed near the <br />shoreline, consistent with the original historic setting of <br />the structure. <br />• The Water Tank shall be properly placed and secured on <br />permanent footings or foundation. <br />• Reconstruction or repair of the Water Tank shall not <br />materially impair or visually obscure the historic <br />features of the structure. <br />• A qualified preservation architect and structural <br />engineer/contractor shall oversee reconstruction of the <br />Water Tank at its new location to ensure that the work is <br />done in accordance with the Relocation Plan. <br />CUL -2: Ground -disturbing <br />CUL -2a: Prior to project ground disturbance, all <br />activities occurring with <br />construction contractor(s) responsible for overseeing and <br />development of both the <br />operating ground -disturbing mechanical equipment (e.g., <br />proposed project and the project <br />on-site construction managers and backhoe operators) shall <br />variant could have a substantial <br />be alerted to the sensitivity of the project site for buried <br />adverse change on <br />archaeological deposits. A qualified archaeologist that <br />archaeological deposits that <br />meets the Secretary of the Interior's Professional <br />qualify as historical resources, <br />Qualifications Standards for Historic Archeology shall <br />as defined in CEQA Guidelines <br />conduct a "tailgate presentation" to alert relevant <br />Section 15064.5, and could <br />construction personnel of the appropriate procedures that <br />materially impair historic- <br />should be undertaken if archaeological deposits are <br />period archaeological deposits. encountered during construction <br />ATTY/RESO.0035/CC RE50 CERTIFYING FINAL EIR —1548 MAPLE <br />REV: 04-30-18 PR <br />Page 31 of 49 <br />1548 MAPLE STREET PROJECT <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />Timeframe for Responsibility for Oversight of <br />Implementation Implementation Implementation <br />Prior to any Project Applicant <br />ground disturbing <br />activities <br />RESO. NO. 15661 <br />MUFF NO. 601 <br />Redwood City <br />Community <br />Development <br />Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.