My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res18 15661
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res18 15661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:59:20 AM
Creation date
10/11/2019 7:59:12 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/7/2018
Description
A RESOLUTION OF THE CITY COUNCIL CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE 1548 MAPLE STREET PROJECT; ADOPTING CEQA FINDINGS; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LSA ASSOCIATES, INC. <br />APRIL 2018 <br />Table 1: Mitigation Monitoring and Reporting Program <br />Impact <br />C. CULTURAL RESOURCES <br />CUL -I: Removal and relocation <br />of the Water Tank would have a <br />substantial adverse change on <br />an eligible City landmark that <br />qualifies as a historical <br />resource, as defined in CEQA <br />Guidelines Section 15064.5. <br />Mitigation Measures <br />1548 MAPLE STREET PROJECT <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />Timeframe for Responsibility for Oversight of <br />Implementation Implementation I Implementation <br />CUL -I: The project applicant shall be responsible for Prior to, during, Project Applicant <br />funding all of the measures outlined below regarding and after <br />relocation of the Water Tank. These measures shall be relocation of the <br />completed prior to, during, and after relocation of the Water Water Tank <br />Tank, as applicable. <br />The following tasks shall be undertaken prior to the Water <br />Tank's relocation: <br />• Photo documentation of the Water Tank shall be <br />completed prior to its removal from the project site. The <br />photography shall be done to Historic American <br />Building Survey -like standards. The photo <br />documentation shall be filed with the Redwood City <br />Public Library History Room/Vollmayer Archives. <br />• A qualified preservation architect and structural <br />engineer/contractor shall prepare a Relocation Plan <br />that:(1) describes the specific approach to dismantling <br />the metal tank from the wood base, and any other <br />portions of the tank; (2) describes how the receiver <br />location will be prepared to accept the tank, including <br />but not limited to grading and construction of the <br />foundation; proposed travel route from the existing <br />location to the new location; (3) delineates the historic <br />features of the tank, specifying features that cannot be <br />repaired, are deteriorated or damaged beyond repair; and <br />(4) describes a permanent commemorative photographic <br />display to be incorporated in the relocated Water Tank. <br />• The Relocation Plan and documentation shall be <br />submitted for review and shall be approved by the City <br />of Redwood City Planning Division prior to the removal <br />of the Water Tank. <br />ATTY/RESO.0035/CC RESO CERTIFYING FINAL EI R —1548 MAPLE <br />REV: 04-30-18 PR <br />Page 30 of 49 <br />RESO. NO. 15661 <br />MUFF NO. 601 <br />Redwood City <br />Community <br />Development <br />Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.