My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res18 15661
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res18 15661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:59:20 AM
Creation date
10/11/2019 7:59:12 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/7/2018
Description
A RESOLUTION OF THE CITY COUNCIL CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE 1548 MAPLE STREET PROJECT; ADOPTING CEQA FINDINGS; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LSA ASSOCIATES, INC. <br />APRIL 2818 <br />Table 1: Mitigation Monitoring and Reporting Program <br />Impact Mitigation Measures <br />HAZ-1 Continued Physical signs of potentially contaminated materials <br />include staining/discoloration, oily sheen or free phase <br />products, odors, the presence of rubble/debris/refuse, or <br />the presence of buried features that may contain <br />hazardous materials (e.g., drums, buckets, sumps, <br />vaults, or pipelines). The contingency plan shall include <br />guidelines for the collection of soil and/or groundwater <br />samples by a qualified environmental professional prior <br />to further work in the newly discovered affected area. <br />The samples shall be submitted for laboratory analysis <br />by a State -certified laboratory under chain -of -custody <br />procedures. The analytical methods shall be selected by <br />the environmental professional. The analytical results of <br />the sampling shall be reviewed by the qualified <br />environmental professional and submitted to the <br />appropriate regulatory agency, if appropriate. The <br />environmental professional shall provide recommenda- <br />tions, as applicable, regarding soil/waste management, <br />worker health and safety training, and regulatory agency <br />notifications, in accordance with local, State, and <br />federal requirements. Work shall not resume in the <br />area(s) affected until these recommendations have been <br />implemented under oversight by the City, Regional <br />Water Board, or any other regulatory agencies with <br />jurisdiction, as appropriate. <br />4. Designated personnel responsible for implementation of <br />the Response Plan. <br />ATTY/RESO.0035/CC RESO CERTIFYING FINAL EIR —1548 MAPLE <br />REV: 04-30-18 PR <br />Page 41 of 49 <br />1548 MAPLE STREET PROJECT <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />Timeframe for Responsibility for Oversight of <br />Implementation Implementation Implementation <br />RESO. NO. 15661 <br />MUFF NO. 601 <br />
The URL can be used to link to this page
Your browser does not support the video tag.