My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res18 15661
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res18 15661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:59:20 AM
Creation date
10/11/2019 7:59:12 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/7/2018
Description
A RESOLUTION OF THE CITY COUNCIL CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE 1548 MAPLE STREET PROJECT; ADOPTING CEQA FINDINGS; AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, ALL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LSA ASSOCIATES, INC <br />APRIL 2018 <br />Table 1: Mitigation Monitoring and Reporting Program <br />Impact <br />G. HAZARDS AND HAZARDOUS MATERIALS <br />Mitigation Measures <br />1548 MAPLE STREET PROJECT <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />Timeframe for Responsibility for Oversight of <br />Implementation Implementation Implementation <br />HAZ-l: Construction of the <br />HAZ-1: A Response Plan shall be prepared by a qualified Prior to any Project Applicant <br />proposed project and the project <br />environmental professional to protect construction workers, construction <br />variant could result in <br />the public, and the environment from hazardous materials, activities <br />accidental releases of hazardous <br />including potential unknown contamination in the <br />materials and/or the disturbance <br />subsurface of the project site. The Response Plan shall be <br />and reuse of soil potentially <br />submitted to and approved by the Regional Water Board <br />impacted with hazardous <br />prior to the start of construction activities, and shall include, <br />materials that could result in <br />but not be limited to, the following: <br />impacts to construction <br />I. Procedures for evaluating, handling, storing, testing and <br />workers, the public, and/or the <br />disposing of soil and groundwater generated during <br />environment. <br />project excavation and grading activities. Materials <br />generated from excavation and grading activities on the <br />project site shall be tested for potential contaminants <br />prior to re -use as engineered fill on-site. <br />2. A project -specific Health and Safety Plan that identifies <br />hazardous materials to be used at the project site (e.g., <br />oils, fuels, paints, solvents, and adhesives) and <br />hazardous materials identified in soil, groundwater, and <br />soil vapor through sampling; describes required health <br />and safety provisions and training for all workers <br />potentially exposed to hazardous materials in <br />accordance with State and federal worker safety <br />regulations; and designates the personnel responsible for <br />Health and Safety Plan implementation. <br />3. A contingency plan that shall be implemented if <br />previously unidentified potentially contaminated <br />material or regulated features (e.g., USTs) are <br />encountered during construction activities. The <br />contingency plan shall include provisions that require <br />notification of the City, Regional Water Board, or any <br />other regulatory agencies with jurisdiction, when <br />potentially contaminated material is encountered. <br />ATTY/RESO.0035/CC RESO CERTIFYING FINAL EIR — 1548 MAPLE RESO. NO. 15661 <br />REV: 04-30-18 PR MUFF NO. 601 <br />Page 40 of 49 <br />Redwood City <br />Community <br />Development <br />Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.